Rublyovo-Arkhangelskaya line
Appearance
Rublyovo-Arkhangelskaya line | |
---|---|
Overview | |
Native name | Рублёво-Архангельская линия |
Locale | Moscow |
Stations | 10 |
Service | |
Type | Rapid transit |
System | Moscow Metro |
Operator(s) | Moskovsky Metropoliten |
Technical | |
Line length | 18.7 kilometres (11.6 mi) |
Character | Underground |
Track gauge | 1,520 mm (4 ft 11+27⁄32 in) |
Electrification | Third rail |
Rublyovo-Arkhangelskaya line (Template:Lang-ru) or Line 17 of the Moscow Metro is currently under construction. It began in 2021 and will end after 2028, opening in two phases.[1][2] Phase 1 is scheduled to be completed by 2026-2027 completing the section from Delevoy Tsentr to Lipovaya Roscha station and phase two is scheduled to open after 2028 expanding the line from Lipovaya Roscha to Ilyinskaya station. In the future it will be connected with Biryulyovskaya line.[3]
Stations
English | Russian | Transfer | Situation | Opening |
---|---|---|---|---|
Ilyinskaya | Ильинская | Under Construction | 2028+ | |
Rublyovo-Arkhangelskoe | Рублево - Архангельское | Under Construction | 2028+ | |
Lipovaya Roscha | Липовая Роща | Under Construction | 2026-2027 | |
Strogino | Строгино | Strogino | Under Construction | 2026-2027 |
Zhivopisnaya | Живописная | Under Construction | 2026-2027 | |
Bulvar Karbysheva | Бульвар Карбышева | Under Construction | 2026-2027 | |
Karamyshevskaya | Карамышевская | Narodnoye Opolcheniye | Under Construction | 2026-2027 |
Zvenigorodskaya | Звенигородская | Under Construction | 2026-2027 | |
Shelepikha | Шелепиха | Shelepikha | Opened | 2018 |
Delovoy Tsentr | Деловой Центр | Delovoy Tsentr | Opened | 2018 |
References
- ^ "В Москве началось строительство Рублево-Архангельской линии метро". Interfax. Retrieved 8 October 2020.
- ^ "Началось строительство Рублево-Архангельской линии метро". Mos.ru (in Russian). 21 September 2020. Retrieved 8 October 2020.
- ^ "На карте метро может появиться 15-я линия - Рублево-Архангельская". kp.kg. 7 October 2016. Retrieved 8 October 2020.