Centennial Wind Power Facility
![](http://upload.wikimedia.org/wikipedia/commons/thumb/b/b9/Centennial_Wind_Power_Facility_Sunrise.jpg/220px-Centennial_Wind_Power_Facility_Sunrise.jpg)
The Centennial Wind Power Facility is a wind farm built by SaskPower with a nameplate capacity of 150 MW. It is located in the hills roughly 25 km east of Swift Current, Saskatchewan. The wind farm was the first in Canada to have a capacity of at least 100 MW upon completion in 2006.[1]
The wind farm was built in two phases: first 75 and then 100 Senvion 2-megawatt wind turbines. The 150 megawatt wind farm has 83 Vestas V80 turbines, with a total rotor diameter of 80 metres and blade length of 39 metres, and can produce enough electricity for about 69,000 Saskatchewan homes.[2]
See also
References
- ^ "Centennial Wind Power Facility". www.saskpower.com. Retrieved 2019-10-16.
- ^ "Archived copy". Archived from the original on 2010-11-21. Retrieved 2010-08-22.
{{cite web}}
: CS1 maint: archived copy as title (link)
50°10′N 107°28′W / 50.167°N 107.467°W
Wind farms in Saskatchewan is very few there are only 4 wind farms in all Saskatchewan (Swift Current[1], Gull Lake[2], R.M. Moosomin[1]) these wind farms generate a lot of power that we use everyday.