Jump to content

West Qinling Tunnel

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Bahnmoeller (talk | contribs) at 20:05, 14 December 2019 (New Guanjiao Tunnel is in operation). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

West Qinling Tunnel
Operation
Openedm
Technical
Track length28,236 metres (92,638 ft)
No. of trackstwo single
Track gauge1,435 mm (4 ft 8+12 in)

The West Qinling Tunnel (Chinese: 西秦岭特长隧道; pinyin: Xīqínlǐng Tècháng Suìdào) is in the middle of the Chongqing–Lanzhou Railway (Chinese: 兰渝铁路), crossing the Qinling. It is a 28236 metre dual-bore railway tunnel in Wudu District, Longnan City, Gansu, north-west China. It is the second longest railway tunnel in China, slightly shorter than the New Guanjiao Tunnel. The construction started on August, 2008, and went on for a duration of about five months and five years using both Tunnel boring machines (TBM) and drill and blast methods.

References