İzmir–Nazilli Regional
Appearance
Overview | |
---|---|
Service type | Regional rail |
Status | Operating |
Locale | Western Anatolia |
First service | 2009 |
Current operator(s) | TCDD |
Route | |
Termini | Basmane station, İzmir Denizli station, Denizli |
Stops | 18 |
Average journey time | 4 hours, 07 minutes |
Service frequency | Daily |
On-board services | |
Class(es) | Classless |
Disabled access | Limited |
Seating arrangements | Coach seating |
Catering facilities | Trolley catering facilities |
Entertainment facilities | TCDD promotional video loop is displayed in the in-train entertainment system |
Technical | |
Rolling stock | TCDD DM15000, TCDD MT30000 |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 125 kilometres per hour (78 mph) |
Track owner(s) | TCDD |
Basmane-Nazilli Regional | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Basmane-Nazilli Regional
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Basmane-Nazilli Regional, numbered as B310, (Template:Lang-tr) is a 175 m (574 ft) passenger train operated by the Turkish State Railways, that runs between Basmane Terminal in Izmir to Nazilli. The train operates along the same route as the Basmane-Denizli Regional, serving a shorter portion of the line. Before regional service was extended to Denizli after track upgrades, three daily trains in each direction would operate as the Basmane-Nazilli Regional. Train service started in 2009 after the completion of the Şirinyer Tunnel.