Jump to content

Sewell Valley Subdivision

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Dicklyon (talk | contribs) at 04:43, 2 January 2020 (MOS:GEOCOMMA). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

The Sewell Valley Subdivision is a railroad line owned by CSX Transportation in the U.S. state of West Virginia. It was formerly part of the CSX Huntington East Division.[1] It became part of the CSX Florence Division on June 20, 2016. The line runs from Meadow Creek, West Virginia, to Nallen, West Virginia, for a total of 43.6 miles. At its south end the line wye's off of the New River Subdivision and at its north end the track comes to an end.[2]

See also

References

  1. ^ http://www.multimodalways.org/docs/railroads/companies/CSX/CSX%20ETTs/CSX%20Huntington%20Div%20East%20ETT%20%231%201-1-2005.pdf Huntington East Division Timetable
  2. ^ "SY-Sewell Valley Sub - The RadioReference Wiki". wiki.radioreference.com. Retrieved 2017-04-07.