Jump to content

Dali–Lijiang railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Apokryltaros (talk | contribs) at 19:58, 7 April 2020 (Reverted edits by 47.142.198.78 (talk) to last version by 47.142.197.82). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

The Dali–Lijiang railway or Dali railway (simplified Chinese: 大丽铁路; traditional Chinese: 大麗鐵路; pinyin: dàlì tiělù), is a single-track electrified railroad in Yunnan Province of Southwest China. The line runs 165 km (103 mi) from Dali to Lijiang and was built from 2004 to 2009.[1][2] Bridges and tunnels account 98 km (61 mi) of the total length of the line.[2] The trip by train between the two cities takes 1.5 hours compared to four hours by bus.[1]

Dali-Lijiang railway

On October 30, 2011, the Dali–Lijiang railway was extended northward by 16-km after the Renhe-Lijiang (Renli) rail extension was completed.[3] The Renli section begins from Renhe station, near Renhe village in Qihe Township of Old Town Lijiang, and runs north to the newly built Lijiang railway station.[3] The new Lijiang station is the second largest passenger railway station in Yunnan and will serve as the southern terminus of the Lijiang–Shangri-La railway.[3]

Rail connections

The Dali railway.

See also

References