Jump to content

Nadym River Bridge

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Tony1 (talk | contribs) at 02:53, 14 April 2020 (Script-assisted fixes: per MOS:NUM, MOS:CAPS, MOS:LINK). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Nadym River Bridge

Мост через Надым
Coordinates65°33′11″N 72°43′13″E / 65.55306°N 72.72028°E / 65.55306; 72.72028
Carriescombined(Trains, Motor vehicles)
CrossesNadym
LocaleNadym, Yamalo-Nenets Autonomous Okrug, Tyumen Oblast
Characteristics
Total length1334 m
Longest span110 m
History
Opened2015
Location
Map

The combined single-level bridge over the Nadym River was opened on September 11, 2015. It is located simultaneously on the SurgutSalekhard highway and on the SalekhardNadym – Korotchaevo railway line . It is an element of the Northern Latitudinal Railway that will connect the Arctic with the center of Russia and the Urals .

The total length of the passage is 3.1 km, including the bridge itself (1334 m) and access areas (1770 m). The length of the superstructure is 110 m. The start of construction is 2011, the opening of the road crossing is 2015. The construction of the railway part of the bridge was postponed..[1]

The construction companies that participated in the construction of the bridge are OJSC Mostostroy-11 , CJSC Kurganstalmost , and LLC Urengoydorstroy[2]

Notes

  1. ^ "Строительство железнодорожной части моста через Надым «отложено в пользу шведов»".
  2. ^ "Кобылкин в компании трех губернаторов и полпреда открыл мост через Надым. Не обошлось без новых российских трендов".