Ripon station
Ripon | ||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | ||||||||||||||||||||
Location | South Industrial Ave. Ripon, California | |||||||||||||||||||
Coordinates | 37°44′19″N 121°07′16″W / 37.738743°N 121.121132°W | |||||||||||||||||||
Line(s) | UPRR Fresno Subdivision | |||||||||||||||||||
Platforms | 1 side platform[1] | |||||||||||||||||||
Tracks | 2 | |||||||||||||||||||
Construction | ||||||||||||||||||||
Accessible | Yes | |||||||||||||||||||
Other information | ||||||||||||||||||||
Status | under construction | |||||||||||||||||||
History | ||||||||||||||||||||
Opening | 2023 | |||||||||||||||||||
Future services | ||||||||||||||||||||
|
Ripon is a future Altamont Corridor Express station in the city of the same name. The platform will be located between the railway right of way and U.S. Highway 99, south of the Main Street interchange. Access to the platform will be via a pedestrian overcrossing southwest over the tracks to South Industrial Avenue.[2] It is expected to open to revenue service in 2023 as a station along the first phase of ACE's expansion to Merced.[3][4]
References
- ^ "Final Environmental Impact Report: Appendix C-8 - Prelim Engineering Plans" (PDF). SJRRC. Retrieved June 11, 2019.
{{cite web}}
: CS1 maint: url-status (link)[dead link] - ^ "Draft Environmental Impact Report". ACE. Retrieved May 13, 2020.
- ^ "ACE Extension Lathrop to Ceres/Merced Draft EIR Executive Summary ES.3.1.2 Operation and Maintenance" (PDF). San Joaquin Regional Rail Commission. Archived from the original (PDF) on January 15, 2019. Retrieved January 14, 2019.
- ^ Holland, John (April 27, 2018). "Expanded train service coming to Modesto, Merced; what it means for commuters". Modesto Bee. Retrieved April 28, 2018.