Jump to content

Senj Hydroelectric Power Plant

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Wolfgang8741 (talk | contribs) at 19:36, 30 June 2020 (swap body of water infobox for dams). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

CountryCroatia
LocationSenj
Reservoir
CreatesSenj
Senj Hydroelectric Power Plant

Senj Hydroelectric Power Plant is a large high-pressure diversion power plant harnessing the Lika and Gacka Rivers water in Croatia. Senj HPP has four turbines with a nominal capacity of 72 MW each[1] having a total capacity of 220 MW.

It is operated by Hrvatska elektroprivreda.[2][3]

Another unit of HE Senj is about to be built with the support of EU funds and HEP Croatian Energy Company. A construction on a billion dollar project is set to start in mid 2014 with completion dates around 2017 or 2018 at the latest. [4]

References