Zhengzhou–Jinan high-speed railway
Appearance
Zhengzhou–Jinan high-speed railway 郑济高速铁路 | |
---|---|
Overview | |
Status | Under construction |
Locale | Zhengzhou Jinan |
Termini | |
Service | |
Operator(s) | China Railway High-speed |
Technical | |
Line length | 378.7 km (235 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 350 km/h (217 mph) |
The Zhengzhou–Jinan high-speed railway is a high-speed railway in China.
History
On 31 August 2016, a feasibility study was published which investigated the construction of a railway between Zhengzhou and Jinan. At the time, it was expected to be completed by 2020.[1]
Construction officially began on 18 June 2020. The line is expected to be completed by 2023.[2]
Stations
Station Name | Chinese | Metro transfers/connections | ||||||||
---|---|---|---|---|---|---|---|---|---|---|
Zhengzhou East | 1 5 | |||||||||
Jingpingyuanxinqu | ||||||||||
Xinxiang East | ||||||||||
Weihui South | ||||||||||
Huajun | ||||||||||
Neihuang | ||||||||||
Puyang East | ||||||||||
Nanle | ||||||||||
Shenxian South | ||||||||||
Liaocheng West | ||||||||||
Chiping South | ||||||||||
Changqing | ||||||||||
Jinan West | 1 4 6 |
References
- ^ 网易 (2016-09-01). "郑州至济南铁路获批 实现2小时直达 2020年建成". news.163.com. Retrieved 2020-07-02.
- ^ "郑济高铁山东段开工 青岛至郑州将缩短至3小时以内". baijiahao.baidu.com. Retrieved 2020-07-02.