Jinan–Laiwu high-speed railway
Appearance
Jinan–Laiwu high-speed railway 济莱高速铁路 | |
---|---|
Overview | |
Status | Under construction |
Termini | |
Stations | 6 |
Service | |
Operator(s) | China Railway High-speed |
Technical | |
Line length | 116 km (72 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 350 km/h (217 mph) |
The Lianyungang–Zhenjiang high-speed railway is a high-speed railway currently under construction in China. It will have a design speed of 350 kilometres per hour (220 mph). The expected journey time between the two terminii is 22.5 minutes.[1]
History
Plans for the railway were confirmed in 2017.[2] At that time, it was expected to open in 2020.[3]
Stations
Station Name | Chinese | Metro transfers/connections |
China Railway transfers/connections | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Jinan East | 3 6 | |||||||||
Ganggou | ||||||||||
Zhangqiu South | ||||||||||
Xueye | ||||||||||
Laiwu North | ||||||||||
Gangcheng east |
References
- ^ "济莱高铁顺利完成首条超高压线路迁改". sd.sina.com.cn. Retrieved 2020-10-22.
- ^ "济南至莱芜高铁项目建设动员会召开". 2018-03-01. Archived from the original on 2018-03-01. Retrieved 2020-10-22.
- ^ "济莱高铁29日开工 预计2020年建成通车". Haibao News. 29 December 2017. Retrieved 22 October 2020.
{{cite web}}
: CS1 maint: url-status (link)