Leaning Juniper Wind Project

Coordinates: 45°36′32″N 120°07′07″W / 45.609024°N 120.118504°W / 45.609024; -120.118504
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by GreenC bot (talk | contribs) at 17:34, 18 November 2019 (Move 1 url. Wayback Medic 2.5). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

The Leaning Juniper Wind Project is an electricity generating wind farm facility located in Gilliam County, Oregon, United States with a total generating capacity of 301.5 megawatts. It is owned by PacifiCorp and began operations in 2006. Leaning Juniper I became operational in September 2006 with 67 1.5 MW wind turbines with a capacity of 100.5 megawatts.[1] "Leaning Juniper II includes 133 GE 1.5 MW wind turbines with a capacity of 201 MW. This phase came online in 2011."[2][3][4][5][6] The Jones Canyon Substation was built as part of this project and to support other wind projects in the area.[7]

See also

References

  1. ^ "Leaning Juniper I". www.pacificorp.com. Retrieved 2019-03-14.
  2. ^ "Leaning Juniper II". www.pacificpower.net. Retrieved 2019-03-14.
  3. ^ "Archived copy". Archived from the original on 2010-08-07. Retrieved 2010-07-28.{{cite web}}: CS1 maint: archived copy as title (link) Retrieved 2009-12-26
  4. ^ http://www.allbusiness.com/energy-utilities/utilities-industry-electric-power-power/5404507-1.html Retrieved 2009-12-26
  5. ^ http://www.transmission.bpa.gov/PlanProj/Wind/completed.cfm?page=juniper Retrieved 2009-12-26
  6. ^ NBC News Retrieved 2009-12-26
  7. ^ http://transmission.bpa.gov/PlanProj/Wind/completed.cfm?page=juniper

External links

45°36′32″N 120°07′07″W / 45.609024°N 120.118504°W / 45.609024; -120.118504