Acquisition Program Baseline

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by InternetArchiveBot (talk | contribs) at 16:12, 1 October 2018 (Rescuing 1 sources and tagging 0 as dead. #IABot (v2.0beta9)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Acquisition Program Baseline (APB) is a term used by the United States Department of Defense to refer to a program threshold and objective values for the minimum number of cost, schedule, and performance attributes that describe the program over its life cycle. The APB initially was developed by the PM for the Milestone B decisions and contains parameters for the program such as key cost, schedule, and performance goals.[1]