Construction began | 1946 |
Opening date | 1950 |
Construction cost | US$31.5 million (Equivalent to US$403 million in 2024) |
Owner(s) | U.S. Army Corps of Engineers |
Dam and spillways | |
Type of dam | Gravity |
Impounds | Etowah River |
Height | 190 ft (58 m)[1] |
Spillway capacity | 297,000 cu ft/s (8,410 m3/s)[2] |
Reservoir | |
Creates | Lake Allatoona |
Total capacity | 367,500 acre⋅ft (453,300,000 m3) |
Catchment area | 1,110 sq mi (2,900 km2) |
Surface area | 12,010 acres (48.6 km2) |
Maximum water depth | 145 ft (44 m) |
Power Station | |
Commission date | 1950 |
Turbines | 3 |
Installed capacity | 85 MW (114,000 hp) |
Allatoona Dam is a concrete gravity dam on the Etowah River, located east of Cartersville in Bartow County in the U.S. state of Georgia. It was authorized by the Flood Control Acts of 1941 and 1944. Delayed due to World War II, construction on the dam began in 1946. The reservoir began to fill in during December 1949 and the dam and power station were operation in January 1950. The power station has an installed capacity of 85 MW and the dam facility is owned and operated by the U.S. Army Corps of Engineers.[3][4]
References
- ^ "Facts about Lake Allatoona". Coosa-Alabama River Improvement Association. Archived from the original on 2005-02-20. Retrieved 8 February 2016.
{{cite web}}
: Unknown parameter|dead-url=
ignored (|url-status=
suggested) (help) - ^ Current Hydraulic Laboratory Research in the United States Bulletin, United States National Hydraulic Laboratory, Washington, D.C. /. NBS special publication. National Bureau of Standards. 1947. Retrieved 8 February 2016.
- ^ "Allatoona Lake History". U.S. Army Corps of Engineers. Retrieved 8 February 2016.
- ^ "Mobile District Hydropower Projects Allatoona Dam and Powerhouse". U.S. Army Corps of Engineers. Retrieved 8 February 2016.
Categories:
- Articles to be merged from April 2018
- ACT River Basin
- Dams in Georgia (U.S. state)
- Buildings and structures in Bartow County, Georgia
- United States Army Corps of Engineers dams
- Dams completed in 1949
- Hydroelectric power plants in Georgia (U.S. state)
- Energy infrastructure completed in 1950
- Gravity dams
- 1950 establishments in Georgia (U.S. state)
- United States dam stubs