Jump to content

Barnard River Scheme

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Downsize43 (talk | contribs) at 11:52, 14 November 2012 (External links: Changed ext link to a more targeted page). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

The Barnard River Scheme is an inter-basin water transfer system in New South Wales, which can transfer water from the Barnard River in the upper Manning River catchment over the Mount Royal Range into the Hunter River.

The scheme was constructed between 1983 and 1985, to provide drought relief water for Bayswater Power Station which was being constructed at the same time.

The scheme consists of:

  • a weir on the Barnard River, which transfers water into a small dam on Orham Creek via a gravity channel
  • a pair of pumping stations which pump the water through pipelines to Bralga Tops
  • another pipeline feeding downhill into Oaky Creek, which is a tributary of the Hunter River.

References