Jump to content

Bukowsko–Nowotaniec wind farm

Coordinates: 49°28′57″N 22°05′16″E / 49.48250°N 22.08778°E / 49.48250; 22.08778
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by GreenC bot (talk | contribs) at 03:10, 18 November 2016 (1 archive template merged to {{webarchive}} (WAM)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Wind rotor blade REpower, Bukowsko 2010

The Bukowsko–Nowotaniec wind farm south of village Bukowsko, Poland, is the second wind-farm project planned by Martifer Renewables and REpower in Poland.[1] The project "Bukowsko" comprises eight REpower MM92 turbines, each with a rated output of 2 megawatts (MW). This is the first wind-farm project undertaken in Poland by Germany's third-largest wind-turbine manufacturer. The projects is located in the south-east of the Sanok county

References

  1. ^ “Bukowsko”, the second wind farm project planned by Martifer Renewables and REpower, will comprise eight MM92 turbines and is due to be commissioned by the end of this year. REpower Systems AG Inaugurates First Wind Farm in Poland 16 czerwca 2009 Archived July 18, 2011, at the Wayback Machine

49°28′57″N 22°05′16″E / 49.48250°N 22.08778°E / 49.48250; 22.08778