Jump to content

Celtic Interconnector

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Wtmitchell (talk | contribs) at 00:31, 24 June 2018 (Reverted edits by Shameboth (talk) (HG) (3.4.3)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Celtic Interconnector
Location
CountryIreland, France
Coordinates52°0′0″N 8°0′0″W / 52.00000°N 8.00000°W / 52.00000; -8.00000 (Celtic Interconnector - Ireland)
48°0′0″N 4°0′0″W / 48.00000°N 4.00000°W / 48.00000; -4.00000 (Celtic Interconnector - France)
General directionnorth-south
FromIreland
Passes throughCeltic Sea
ToFrance
Ownership information
PartnersEirGrid, RTE
Construction information
Expected2025
Technical information
Typesubmarine cable
Type of currentHVDC
Total length600 km (370 mi)
Power rating700 MW
DC voltage± 320 kV or ± 500 kV

Celtic Interconnector is a proposed 700 MW HVDC submarine power cable between the southern coast of Ireland and the north-west coast of France.[1]

The project is a cooperation between the Irish TSO EirGrid and French TSO RTE[1] for the purpose of improving security of supply, reducing consumer electricity costs and supporting the development of renewable energy.[2]

The project includes plans for a direct fibre optic communications link between Ireland and France.[3][4]

Project

The electrical interconnector would be the first between the two countries, has an expected cost of €1bn and a planned capacity of 700 MW[1] i.e. an annual transmission capacity of 6.1 TWh.

Of its length of 600 km, 500 km would pass through Irish, British and French waters[1] of the Celtic Sea.

In July 2016 after completion of a feasibility study the two countries agreed to proceed with a two-year planning phase.[2]

The planning phase includes an economic assessment, environmental considerations and will determine the placement of the cable and onshore stations, with a decision whether to carry out the project is foreseen for 2020 or 2021.[5]

If built, the cable is expected to be operational by 2025.[1]

See also

External links

References

  1. ^ a b c d e "President Hollande and An Taoiseach Kenny agree €1 billion Ireland-France Electricity Interconnector". 4coffshore.com. 2016-07-21. Retrieved 2016-08-08.
  2. ^ a b Hunt, Gordon (2016-07-21). "Subsea electricity cable linking Ireland and France powers ahead". siliconrepublic.com. Retrieved 2016-08-08.
  3. ^ "Celtic Interconnector". eirgridgroup.com. Retrieved 2017-08-12.
  4. ^ "EUR 4 million EU funding for proposed electricity link between France and Ireland - Energy - European Commission". ec.europa.eu. 2017-06-28. Retrieved 2017-08-12.
  5. ^ Bairstow, Jonny (2016-07-25). "Ireland-France power link reaches planning stage". energylivenews.com. Retrieved 2016-08-08.