Chandrapur–Padghe HVDC transmission system
Location
CountryIndia
StateMaharashtra
Coordinates20°00′36″N 79°17′06″E / 20.01000°N 79.28500°E / 20.01000; 79.28500 (Chandrapur-Padghe HVDC transmission system- Chandrapur converter station)
19°21′26″N 73°11′18″E / 19.35722°N 73.18833°E / 19.35722; 73.18833 (Chandrapur-Padghe HVDC transmission system- Padghe converter station)
FromChandrapur
ToPadghe, near Mumbai
Ownership information
OwnerMaharashtra State Electricity Board
Construction information
Installer of substationsABB, Bharat Heavy Electricals Limited
Commissioned1999
Technical information
Typeoverhead line
Type of currentHVDC
Total length752 km (467 mi)
Power rating1,500 MW
DC voltage±500 kV
No. of poles2

The Chandrapur–Padghe HVDC transmission system is an HVDC connection[1] between Chandrapur and Padghe (near Mumbai) in the state of Maharashtra in India, which was put into service in 1999.

It connects the coal-fired Chandrapur Super Thermal Power Station to the major load centre of Mumbai. The project has a 752 kilometres (467 mi) long bipolar overhead line. The transmission voltage is ±500 kV and the maximum transmission power is 1,500 megawatts. The scheme uses thyristor valves, arranged in a single twelve pulse bridge per pole. The project was built by ABB and BHEL, and is owned by Maharashtra State Electricity Board (MSEB).

The eastern (Chandrapur) converter station is located 20 kilometres (12 mi) from the Chandrapur back to back HVDC station. The close proximity of the two converter stations meant that the control systems needed to be carefully coordinated, a task made more challenging by the fact that the two stations were built by different manufacturers. To address this problem a series of joint simulation studies, involving the control equipment from both converter stations connected to a common simulator, was performed.[2]

Sites

Site Coordinates
Chandrapur converter station 20°00′36″N 79°17′06″E / 20.01000°N 79.28500°E / 20.01000; 79.28500 (Chandrapur-Padghe HVDC transmission system - Chandrapur converter station)
Padghe converter station 19°21′26″N 73°11′18″E / 19.35722°N 73.18833°E / 19.35722; 73.18833 (Chandrapur-Padghe HVDC transmission system - Padghe converter station)