Jump to content

Senator William V. Roth Jr. Bridge

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 71.200.62.77 (talk) at 19:15, 6 September 2016 (Physical Description). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Chesapeake & Delaware Canal Bridge
Coordinates39°32′59″N 75°39′23″W / 39.549722°N 75.656501°W / 39.549722; -75.656501 (Senator William V. Roth, Jr. Bridge)
Carries6 lanes of DE 1
CrossesChesapeake & Delaware Canal
LocaleSt. Georges, Delaware
Official nameSenator William V. Roth, Jr. Bridge
Other name(s)New St. Georges Bridge
Maintained byU.S. Army Corps of Engineers
Characteristics
DesignCable-stayed bridge
Total length4,650 feet (1,417 m)
Width127 feet (39 m)
Longest span750 feet (229 m)
Clearance below100 feet (30.5 m)
History
Construction start1991
Construction end1994
OpenedDecember 23, 1995
Location
Map

The Chesapeake & Delaware Canal Bridge (officially the Senator William V. Roth, Jr. Bridge) is a concrete and steel cable-stayed bridge that spans the Chesapeake & Delaware Canal near St. Georges, Delaware. The bridge is located near a tolled section of Delaware Route 1 that runs parallel to the St. Georges Bridge carrying U.S. Highway 13. In November 2006, the bridge was named after U.S. Senator William V. Roth, Jr., who not only lent his name to the Roth IRA, but was instrumental in securing federal funding to build the bridge. It is owned and operated by the U.S. Army Corps of Engineers and does not carry a toll, despite the location of a nearby toll plaza.

History

The idea of the C & D Canal Bridge came about in the late 1980s when former Governor Michael N. Castle investigated a new canal crossing to replace the aging St. Georges Bridge. Originally, the plan was to use the four-lane bridge as part of the planned "Dover Extension" of the Delaware Turnpike, but local opposition to the plan forced Delaware officials to look at a new location. Although different plans were looked at, the final plan, using a concrete bridge was approved in 1989.

Shortly after construction began on the "Route 7 Relocation" the present-day Tybouts Corner-Delaware Turnpike section of Delaware Route 1, construction began on the bridge in 1992, with the excavation of the nearby site, located just one mile west of the corporate limit of St. Georges. The two halves were joined at the center in early 1994 and the bridge opened in December 9, 1995 when the Tybouts Corner-Biddles Corner section of Delaware Route 1 was completed.

After its opening, the Corps of Engineers rerouted U.S. Highway 13 onto the new bridge and for a few years, closed the old St. Georges Bridge, with the intent of demolishing it. After local opposition, the old St. Georges Bridge was rehabilitated with new lead-free paint, new roadway deck, and several joint and structural repairs that allows medium weight trucks, for local deliveries, to use the old crossing. A new exit for U.S. 13 and Lorewood Grove Road, which connects St. Georges with Summit was opened after the rehabilitation project was completed.

As a stipulation in keeping both bridges open, and in the case that the older St. Georges Bridge is in need of repair or replacement, no tolls are charged on the C & D Canal Bridge. The new exit for U.S. 13/Lorewood Grove Road serves as the "last chance" exit before the Biddle Corner toll plaza for Delaware Rt. 1.

Physical Description

The C & D Canal Bridge, the first cable-stayed bridge of its type in the Delaware Valley area (all previous Delaware River or C & D Canal bridges are either suspension, cantilever, or simple truss designs), is also the first pre-cast concrete bridge to be built in the United States. Modeled after that of the Sunshine Skyway Bridge in St. Petersburg, Florida, the bridge incorporates many features not found on the other canal bridges:

  • Fixed high-level crossing, a 100 feet (30 m) clearance like that of the other Canal highway crossings.
  • 750 feet (229 m) center span, with the major anchorages out of the water (thus preventing a catastrophic collision similar to the old Sunshine Skyway Bridge and previous C & D Canal bridges)
  • Six travel lanes, with the option of restriping to eight
  • Pull-off emergency shoulders on both sides (under the current striping arrangement)
  • Roadway lighting – they were removed in 2003 at the requests of canal pilots and replaced with low-voltage low-pressure sodium floodlights that illuminate the main support anchors
  • 65-mph speed limit
  • Separate approach spans, only joining at the anchorages of the cables

The bridge also incorporates a 3% climbing grade, a feature lacked on the nearby St. Georges Bridge. The bridge, built between 1991 and 1994, utilized pre-cast concrete segments that were made in Cape Charles, Virginia, and transported by barge until it reached the job site. Once at the site, the segments were fitted into place like that of a jigsaw puzzle.