Chestnut Hill station (MBTA)
Chestnut Hill | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||||
Location | Hammond Street and Chestnut Hill Road Chestnut Hill, Newton, Massachusetts | ||||||||||||
Coordinates | 42°19′37″N 71°9′53″W / 42.32694°N 71.16472°W | ||||||||||||
Line(s) | Highland branch | ||||||||||||
Platforms | 2 side platforms | ||||||||||||
Tracks | 2 | ||||||||||||
Construction | |||||||||||||
Parking | 69 spaces | ||||||||||||
Bicycle facilities | Covered racks | ||||||||||||
Accessible | No | ||||||||||||
History | |||||||||||||
Opened | July 4, 1959[1] | ||||||||||||
Passengers | |||||||||||||
2013 | 1,416 (weekday average boardings)[2] | ||||||||||||
Services | |||||||||||||
| |||||||||||||
| |||||||||||||
|
Chestnut Hill station is a light rail station on the MBTA Green Line D branch, located off Hammond Street north of Massachusetts Route 9 in the Chestnut Hill neighborhood of Newton, Massachusetts. The station has two side platforms serving the line's two tracks. Chestnut Hill station is not accessible, but renovations are planned.
History
[edit]The Brookline Branch of the Boston and Worcester Railroad was extended west to Newton Upper Falls by the Charles River Branch Railroad in November 1852. Chestnut Hill was added as a flag stop by 1858.[3] After 1886, loop service on the Highland branch was run via what is now the Framingham/Worcester Line and later the Needham Line. The final trains on the line ran on May 31, 1958. The line was converted to light rail by the M.T.A. and Chestnut Hill reopened on July 4, 1959, along with the rest of the line.[1] The original stone station was torn down and replaced by a small wooden shelter on the inbound platform.
In 2019, the MBTA indicated that the four remaining non-accessible stops on the D branch were "Tier I" accessibility priorities.[4] A preliminary design contract for accessibility modifications at the four stations was issued in February 2021.[5][6] The station platforms will be raised and rebuilt, and a new accessible path to Hammond Road will be built.[7] Design reached 75% in June 2022 and was completed late that year.[7][8] Plans shown in March 2024 called for the platforms to be rebuilt in their existing configuration.[9]
By November 2023, construction was expected to be advertised in early 2024 and begin midyear.[10] However, in June 2024, the MBTA indicated that the renovations at the four stations would be done in two phases. The first phase – sections of accessible platform similar to those previously installed at Newton Highlands, and some entrances made accessible – was expected to be complete by the end of the year.[11] Work began in October 2024.[12] The full renovations are expected to take place in 2027 to serve new Type 10 vehicles.[13]
References
[edit]- ^ a b Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
- ^ "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
- ^ ABC Pathfinder Railway Guide. New England Railway Publishing Company. 1858. p. 12 – via Google Books.
- ^ "Preview of 2019 Recommendations: Presentation to the FMCB" (PDF). Plan for Accessible Transit Infrastructure (PATI). Massachusetts Bay Transportation Authority. April 1, 2019. p. 12.
- ^ "D Branch Station Accessibility Improvements". Massachusetts Bay Transportation Authority. Archived from the original on March 19, 2021. Retrieved March 23, 2021.
- ^ "D Branch Station Accessibility Improvements: Waban, Eliot, Chestnut Hill, Beaconsfield: Virtual Public Meeting" (PDF). Massachusetts Bay Transportation Authority. April 29, 2021.
- ^ a b "D Branch Station Accessibility Improvements: Beaconsfield, Chestnut Hill, Eliot, Waban: Public Meeting" (PDF). Massachusetts Bay Transportation Authority. June 23, 2022.
- ^ "System-Wide Accessibility Initiatives—December 2022" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 6, 2022. p. 4.
- ^ "Green Line D Branch Accessibility Upgrades" (PDF). Massachusetts Bay Transportation Authority. March 14, 2024.
- ^ "System-Wide Accessibility Initiatives—November 2023" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. November 27, 2023. pp. 3–4.
- ^ "Accessibility Initiatives—June 2024" (PDF). Massachusetts Bay Transportation Authority. June 25, 2024. p. 4.
- ^ "October Service Changes: MBTA Continues Repair Work to Improve Reliability Across the System" (Press release). Massachusetts Bay Transportation Authority. September 18, 2024.
- ^ "MBTA Green Line D Branch Station Accessibility Improvements" (PDF). Massachusetts Bay Transportation Authority. October 2024.
External links
[edit]Media related to Chestnut Hill station (MBTA) at Wikimedia Commons
- MBTA - Chestnut Hill
- Google Maps Street View: Hammond Street stairs, Middlesex Road entrance
- Green Line (MBTA) stations
- Railway stations in Middlesex County, Massachusetts
- Former Boston and Albany Railroad stations
- Railway stations in the United States opened in 1959
- Buildings and structures in Newton, Massachusetts
- Tram stubs
- Massachusetts railway station stubs
- Massachusetts Bay Transportation Authority stubs