Jump to content

Diitabiki

Coordinates: 4°6′48″N 54°39′35″W / 4.11333°N 54.65972°W / 4.11333; -54.65972
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Otter (talk | contribs) at 14:01, 9 September 2018 (+image). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Drietabbetje
Diitabiki
Dritabiki
Village
Diitabiki Drietabbetje (Dutch map of 1913)
Diitabiki Drietabbetje (Dutch map of 1913)
Drietabbetje is located in Suriname
Drietabbetje
Drietabbetje
Coordinates: 4°6′48″N 54°39′35″W / 4.11333°N 54.65972°W / 4.11333; -54.65972
Country Suriname
DistrictSipaliwini District
Time zoneUTC-3 (AST)
The people of Drietabbetje welcome some visitors in 1969.

Diitabiki (Sranan Tongo: Dritabiki, Dutch: Drietabbetje) is a Ndyuka village in the Sipaliwini District of Suriname. Diitabiki is the residence of the gaanman of the Ndyuka people.

Name

Both the Ndyuka and Sranan Tongo name for the village translates to "three islands," with the word tabiki meaning "island" in both languages. While drie indeed also translates as "three" in the Dutch language, the word tabbetje is a homophonic translation of the Ndyuka word.

Education

Since the 1960s, Diitabiki is home to the Granman Akontoe Velantie primary school, which as of 2015 has 333 pupils.[1] In 2015, volunteers from Diitabiki and its surroundings extended the school with an extra classroom.[2]

Healthcare

Diitabiki is home to a Medische Zending healthcare centre.

Energy

Between 1985 and 1987, electricity was provided by an overhead power line connected to the Puketi hydroelectric power plant.[3] After this power plant stopped working during the Surinamese Interior War there have been attempts to rehabilitate the facility, but after a university delegation in 2003 and 2004 investigated the possibilities for hydroelectric power in the region, the Ministry for Regional Development decided to instead fund the construction of a larger hydroelectric power plant at the Gran Olo rapids nearby.[4] Although it will initially only power Puketi and Futupasi, the plan is to eventually connect Diitabiki to the grid as well. As of 2016, the Gran Olo power plant is still under construction.[5]

Transportation

By air

Diitabiki is served by Drietabbetje Airstrip, offering Caricom Airways scheduled services from Paramaribo.

Notes

  1. ^ Alendy, Cythia (14 October 2015). "School Dritabiki nog steeds gesloten". Starnews. Retrieved 18 April 2016.
  2. ^ "Dorpelingen Drietabbetje bouwen leslokaal bij school". de Ware Tijd. 14 October 2015. Retrieved 18 April 2016.
  3. ^ Van Els 2012, p. 284.
  4. ^ Van Els 2012, pp. 285–286.
  5. ^ "Zoveelste vertraging oplevering miniwaterkrachtcentrale Gran Olo Sula – Eén transformator ongeschikt voor stroomleverantie". Obsession Magazine. 11 October 2014. Retrieved 26 April 2016.

References