Jump to content

Dolphin–Palmetto Interchange

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by B137 (talk | contribs) at 14:36, 22 February 2016 (See also). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Dolphin–Palmetto Interchange
Construction on the interchange in November 2014 from SR 826 northbound
Map
Location
Miami-Dade County, Florida
Roads at
junction
Construction
TypeStack interchange
ConstructedReconstructed 2012–2015
Maximum
height
Sea level to 100 feet (30 m) AMSL (highest flyovers)
Maintained byFDOT

The Dolphin–Palmetto Interchange, also known as 826–836, is a complex four-level stack interchange in Miami-Dade County, Florida. It primarily serves as a highway interchange between State Road 826 (SR 826, Palmetto Expressway) and SR 836 (Dolphin Expressway), but also has ramps to surface streets such as SR 969 (Milam Dairy Road) and Flagler Street.[1] The reconstruction project was completed in phases from 2012 to 2015[2][3] at a cost of about $560 million,[4] with related construction beginning in 2009, replacing the old two-level diamond interchange. The interchange was considered well beyond safe capacity, serving over 400,000 vehicles per day. The reconstruction was the final phase in a 12-step program to improve the highly trafficked Palmetto Expressway,[5] though as of 2014 a new project to add express lanes to the Palmetto Expressway is proposed.[6] Work took place with phased detours, closures, and openings. All roads involved were kept open throughout construction. Much of the new interchange opened in October 2015,[7] including the two highest flyovers,[8] with completion at that point scheduled for March 2016.[9]

See also

References

  1. ^ "Project Information". Florida Department of Transportation. Retrieved November 25, 2014.
  2. ^ "4 New Ramps or Bridges at Palmetto Expressway–Dolphin Expressway Interchange Opening Sunday". Miami: WTVJ-TV. January 11, 2014. Retrieved November 25, 2014.
  3. ^ "Changes on SR 836 Now in Effect". The Miami Herald. November 21, 2014. Retrieved November 25, 2014.
  4. ^ "Traffic Nightmare Coming At 836–826 Interchange". Miami: WFOR-TV. April 19, 2013. Retrieved November 25, 2014.
  5. ^ "Project History". Florida Department of Transportation. Retrieved November 25, 2014.
  6. ^ Masihy, Myriam (September 9, 2013). "Express Lanes Coming Soon to the Palmetto Expressway and Interstate 75". Miami: WTVJ-TV. Retrieved November 25, 2014.
  7. ^ Batchelor, Amand (October 8, 2015). "Major changes coming to Palmetto, Dolphin Expressway". WPLG-TV. Retrieved November 10, 2015.
  8. ^ Chardy, Alfonso (October 6, 2015). "Another major traffic pattern shift scheduled for Dolphin and Palmetto expressways". Miami Herald. Retrieved February 22, 2016.
  9. ^ Borge, Vanessa (October 8, 2015). "Big Changes To Palmetto Expy/Dolphin Expy This Weekend". WFOR-TV. Retrieved February 22, 2016.

Template:Miami Area Roads