Farm to Market Road 2031
Appearance
Route information | ||||
---|---|---|---|---|
Maintained by TxDOT | ||||
Length | 6.591 mi[1] (10.607 km) | |||
Existed | 1952–present | |||
Major junctions | ||||
South end | Gulf of Mexico | |||
North end | SH 60 in Matagorda | |||
Location | ||||
Country | United States | |||
State | Texas | |||
Counties | Matagorda | |||
Highway system | ||||
| ||||
|
Farm to Market Road 2031 (FM 2031) is a 6.591-mile (10.607 km) farm to market road in the U.S. state of Texas.[1]
Route description
FM 2031 begins at the Gulf of Mexico, at the entrance to Matagorda County Jetty Park on Matagorda Peninsula. The route heads north along the strip of land which separates Matagorda Bay and East Matagorda Bay, and parallels the Colorado River to its west. The highway enters Matagorda before ending at SH 60.[2]
History
FM 2031 was designated in 1952. A portion of the route was originally designated as SH 344 from 1941 until 1952.[1][3]
Major intersections
The entire route is in Matagorda County.
Location | mi[4] | km | Destinations | Notes | |
---|---|---|---|---|---|
| 0.0 | 0.0 | Matagorda County Jetty Park | Southern terminus | |
Matagorda | 6.6 | 10.6 | SH 60 – Bay City | Northern terminus | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi |
References
- ^ a b c Transportation Planning and Programming Division (n.d.). "Farm to Market Road No. 2031". Highway Designation Files. Texas Department of Transportation. Retrieved 2008-03-11.
- ^ Transportation Planning and Programming Division (2012). Texas County Mapbook (PDF) (Map) (2012 ed.). 1:120,000. Texas Department of Transportation. p. 545. OCLC 867856197. Retrieved 2011-09-28.[dead link]
- ^ Transportation Planning and Programming Division (n.d.). "State Highway No. 344". Highway Designation Files. Texas Department of Transportation. Retrieved 2011-09-29.
- ^ "Overview map of Farm to Market Road 2031 Distances Between Interchanges" (Map). Google Maps. Retrieved 2011-09-29.