Jump to content

Furnas Dam

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Giso6150 (talk | contribs) at 02:58, 18 February 2016 (-Category:Buildings and structures in Minas Gerais; ±Category:Dams in BrazilCategory:Dams in Minas Gerais using HotCat per WP:DUPCAT). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Furnas Dam
LocationMinas Gerais, Brazil
Construction began1957
Opening date1963
Operator(s)Eletrobrás Furnas
Dam and spillways
ImpoundsGrande River
Height127 m (417 ft)
Length550 m (1,800 ft)
Width (base)15 m (49 ft)
Reservoir
CreatesFurnas Reservoir
Total capacity22,590×10^6 m3 (18,310,000 acre⋅ft)
Surface area1,473 km2 (569 sq mi)
Power Station
Turbines8 × 152 MW (204,000 hp) Francis-type
Installed capacity1,216 MW (1,631,000 hp)

The Furnas Dam is a hydroelectric dam in the Minas Gerais state of Brazil. A small settlement was built near the dam with the same name, to house the workers during the dam construction. The main purpose of the dam and reservoir are the production of electricity and the regulation of the flow of the Grande River.

Construction

Construction on the dam began in 1957 and was the first large dam in Brazil. It was built by Wimpey Construction and was completed in 1963.[1] It is built on the canyon of the Grande River, before joining the Sapucaí River downstream. The dam is 127-metre (417 ft) tall, 550 metres (1,800 ft) long, and 15 metres (49 ft) wide at its crest.

The large reservoir, with a surface area of 1,473 square kilometres (569 sq mi), almost half of the Brazilian coastline, started to form in 1963, bordering thirty-four municipalities. The volume of water is seven times that of Guanabara Bay, at 22,590 million cubic metres (18,310,000 acre⋅ft). Normal water level averages at 768 metres (2,520 ft).

See also

References

  1. ^ White, p. 34

Sources

  • White, Valerie (1980). Wimpey: The first hundred years. George Wimpey.