Goldisthal Pumped Storage Station

Coordinates: 50°30′29″N 11°01′33″E / 50.5081°N 11.0258°E / 50.5081; 11.0258
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 77.56.53.183 (talk) at 14:53, 1 August 2015 (→‎External links). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Goldisthal Pumped Storage Station
The power station on the banks of the lower reservoir
Map
CountryGermany
LocationGoldisthal
Coordinates50°30′29″N 11°01′33″E / 50.5081°N 11.0258°E / 50.5081; 11.0258
StatusOperational
Construction began1997
Commission date2003/2004
Owner(s)Vattenfall
Power generation
Nameplate capacity1,060 MW
Annual net output1,806 GWh
External links
CommonsRelated media on Commons

The Goldisthal Pumped Storage Station is a pumped-storage power station in the Thüringer Mountains at the upper run of the river Schwarza in Goldisthal, Germany. It was constructed between 1997 and 2004. It has an installed capacity of 1,060 megawatts (1,420,000 hp), the largest hydroelectric power plant in Germany and one of largest in Europe.[1][2]

Facility

The upper reservoir is located at an altitude of 880 m (2,887 ft). It has an active (or usable) capacity of 12 millions m³ and a surface area of 55 hectares. In order to create this basin, the mountain summit was cleared away. This stored quantity of water is enough for eight hours of operation. This corresponds to a maximally storable electric power quantity of 8.5 GWh with the existing height difference between storage basins and turbines. Two 800 m long penstocks, inclined at approximately 25 degrees serve as a conduit for water transfer. The lower reservoir has a capacity of 18.9 million cubic metres (670×10^6 cu ft). The power station contains four 265 MW Francis pump turbines.[1][2]

Construction

From the outset of planning of this power station, it met with opposition and was contested with broad resistance from environmental protection groups, in particular from the Green League. The project was first discussed in 1965 and in 1975 geological investigations were carried out. Planning was halted in 1980–1981 due to funding issues but was then resumed in 1988. Construction eventually began in 1997 and the first generators were commissioned in 2003. It was officially opened on 30 September 2003. In 2004, all four generators were commissioned. The construction costs amounted to 600 million euros.

References