Jump to content

Ivy Creek Greenway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Tibersync1 (talk | contribs) at 01:20, 6 September 2018 (Created page with '{{Use mdy dates|date=September 2018}} {{Infobox cycling path | name = Ivy Creek Greenway | embed = | cellstyle = | photo = | photo_size = | photo_alt = | ca...'). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)

Ivy Creek Greenway
Length3.4 miles (5.5 km)
LocationBuford, Georgia, USA
Suwanee, Georgia, USA
Trailheads
UseCycling and pedestrians
SeasonYear round
SurfaceConcrete
WebsiteIvy Creek Greenway

The Ivy Creek Greenway is a 3.4-mile (5.5 km) multi-use trail under construction in the cities of Buford, Georgia and Suwanee, Georgia, in the United States.

In 2014, a 1.5-mile section of the trail was added and includes two boardwalks, an overlook and a 270-foot cable bridge spanning Ivy Creek.[1][2]

On February 27, 2018, the greenway was designated as one of the signature trails of Gwinnett County.[3]

See also

References

  1. ^ Reed, Kristi. "Newest section of Ivy Creek Greenway opens". Gwinnett Daily Post.
  2. ^ Woodson, Joy. "Ivy Creek Greenway Extension Approved Near Mall of Georgia". Patch.
  3. ^ "Gwinnett trails master plan unveiled for review".

External links