Jump to content

Jincheng Civil Defense Tunnel

Coordinates: 24°25′59.0″N 118°19′12.8″E / 24.433056°N 118.320222°E / 24.433056; 118.320222
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Chongkian (talk | contribs) at 07:40, 13 September 2018 (Filled in 1 bare reference(s) with reFill ()). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

24°25′59.0″N 118°19′12.8″E / 24.433056°N 118.320222°E / 24.433056; 118.320222

Jincheng Civil Defense Tunnel
Overview
Official name金城民防坑道
LocationJincheng, Kinmen, Taiwan
StatusHeritage
Operation
Work begunMarch 1978
OpenedJune 1969
Technical
Length2,315 meters

The Jincheng Civil Defense Tunnel (Chinese: 金城民防坑道; pinyin: Jīnchéng Mínfáng Kēngdào) is a tunnel in Jincheng Township, Kinmen County, Taiwan.

History

After the first and second Taiwan Strait Crisis, the government decided to construct an underground civilian tunnels for protection. The construction of the tunnel started in March 1968 and completed in June 1969 for 15 months of works. It was then used to connect various public buildings in the island.[1]</ref>

Architecture

The tunnel has a total combined length of 2,315 meters.[1] It is equipped with air raid shelters, ammunition depots and pillboxes.[2]

See also

References

  1. ^ a b "Jincheng Tunnels". Classic Kinmen Travel. 22 February 2013. Retrieved 13 September 2018.
  2. ^ "Jincheng Civil Defense Tunnel". roundTAIWANround. Retrieved 13 September 2018.