Liffey Service Tunnel

Coordinates: 53°20′48″N 6°13′49″W / 53.34667°N 6.23028°W / 53.34667; -6.23028
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Rwxrwxrwx (talk | contribs) at 15:04, 29 November 2017 (cleanup). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

River Liffey Service Tunnel
Recovery of the TBM after tunnel completion
Overview
LocationDublin, Ireland
Operation
Work begun2007
ConstructedPipe Jacking
OwnerDublin City Council
Technical
Length260m
Tunnel clearance2.5m ID

The Liffey Service Tunnel is a service tunnel for various pipelines in Dublin, Ireland, owned by Dublin City Council.

Project

The tunnel was designed by British company Atkins[1] and constructed by a joint venture of the German contractor Züblin and the Irish contractor Cleary & Doyle of Wexford. Construction period was from September 2006 until October 2008.[citation needed]

Tunnel design

The tunnel is 260 metres long and consists of a single bore of diameter 2.96 metres. It is built in pipe-jacking using a Herrenknecht tunnel-boring machine and 2.5-metre-long precast reinforced-concrete pipes. The tunnel leads from the southern edge of the East Link Bridge, underneath the River Liffey towards the North Quay Wall, approximately 150 metres west of The Point Theatre. The drive and reception shafts are respectively 19 m and 22 m deep, leaving the tunnel passing approximately 8 m below the shipping channel of the river.[citation needed]

An access cover near the northern end of the tunnel