MV Cape Orlando

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Trappist the monk (talk | contribs) at 15:45, 28 June 2016 (→‎References: template for NVR urls; using AWB). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

History
United States
NameMV Finneagle
NamesakeFinland and Eagles
OwnerSea Lift Command
BuilderKockums Varv Shipyard A,B., Malmö, Sweden
Laid downFebruary 20, 1980
CompletedFebruary 18, 1981
RenamedMV Cape Orlando, July 12, 1993
Statuslaid up in a layberth at the former NAS Alameda, CA., and can be activated in 5 days (ROS-5)
General characteristics
Class and typeRoll-on/Roll-off Ship
Displacement32,799 long tons
Length635 feet
Beam91 feet
Draft30 feet
PropulsionDiesel, 2 propellers
Speed16.2 knots
RangeNot Disclosed
Complement25 when in active status, 9 when in reserve

The MV Cape Orlando was laid down on February 20, 1980 under the name MV Finneagle at Kockums Varv Shipyards under contract with Finnlines. It was completed and delivered a year later on February 18, 1981. The ship was then sold to Zenit Dry Good Corp. and renamed the MV Zenit Eagle on June 28, 1983, and then resold again to AutoMar II Corp, 1983 and renamed once more to American Eagle. From there it was chartered under long-term contract to US department of Transportation and then brought over to the Ready Reserve Fleet on September 14, 1994. Since then it has played roles in transportation details in the Iraq and Afghanistan wars.

References

External links