Jump to content

New Livingstone Stadium

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by SecretName101 (talk | contribs) at 05:19, 8 January 2016 (top: placed unreferenced template). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

New Livingstone Stadium was a proposed multi-purpose stadium in Livingstone, Zambia, that was in the planning stages until Zambia backed out of hosting the 2011 All-Africa Games in 2009. It would have been used mostly for football matches and hosted some events for the 2011 All-Africa Games. The stadium would have hada capacity of 50,000 people. It was to be built along with new stadiums in Ndola and Lusaka.