Jump to content

Orșova Wind Farm

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Robertiki (talk | contribs) at 04:15, 29 March 2015 (Removed nonsense parameter th_fuel_primary and th_combined_cycle). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Orşova Wind Farm
Country
LocationOrşova, Mehedinţi County
StatusUnder construction
Commission date2009
OwnerToplet Energy
Power generation
Units operational25
Nameplate capacity35 MW

The Orşova Wind Farm is an under construction wind power project in Mehedinţi County, Romania. It will consist of an individual wind farm with 25 individual wind turbines[1] with a nominal output of around 1.4 MW which will deliver up to 35 MW of power, enough to power over 22,925 homes, with a capital investment required of approximately US$75 million.

References