Jump to content

SydVästlänken

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 217.228.36.123 (talk) at 13:37, 8 September 2015. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

SydVästlänken
South–West Link
Location
CountrySweden, Norway
ProvinceNärke, Skåne, Västergötland, Östergötland, Småland
General directionnorth–south, west–south
FromHallsberg in Närke; Oslo
Passes throughBarkeryd, Nässjö 57°44′52″N 14°39′19″E / 57.74778°N 14.65528°E / 57.74778; 14.65528 (Barkeryd static inverter plant)
ToHurva, Hörby 55°49′59″N 13°36′08″E / 55.83306°N 13.60222°E / 55.83306; 13.60222 (Hurva static inverter plant)
Ownership information
OperatorSvenska Kraftnät, Statnett
Construction information
Expected2013/2015
Technical information
Typeoverhead line; subsoil cable
Type of currentcombined HVDC and HVAC
Power rating1,200 MW
AC voltage400 kV
DC voltage300 kV

SydVästlänken (English: South–West Link) is a project for reinforcement of power grids in Southern Sweden and Oslo area in Norway. The project to be implemented by Swedish and Norwegian national grids operators Svenska Kraftnät and Statnett.

Aim

The southern part of the Nordic power grid between Sweden and Norway is relatively vulnerable for disruptions and quite often there are bottlenecks for power transmission. While in dry periods and low consumption periods problems are related to the West coast in Sweden, in periods with high hydroproduction and peak consumption problems are mainly related to the grid in Oslo area in Norway (the so-called Hasle-trappen).

Western branch will not be built 2013-04-29

Swedish power grid, together with Statnett decided not to implement the project south-western branch of the link between backbone stations Barkeryd and Tveiten. New calculations show that the benefits have been reduced significantly compared with the original analyzes.

[1] The aim of SydVästlänken is to increase the transmission capacity and the robustness of the transmission system in this area. Increased capacity and flexibility of the transmission is particularly import for facilitation of the increased wind power generation.[2]

History

The project was proposed in 2005 when Svenska Kraftnät made decision to construct the Sydlänken (Southern Link), a reinforcement of the transmission grid between the Swedish provinces Närke and Skåne.[2] In January 2008, Svenska Kraftnät and Statnett proposed to expand this project by integrating it with a new VSC HVDC connection between Norway and Sweden.[1] Correspondingly, the project was renamed SydVästlänken.

Description

The SydVästlänken will include sections:

The Barkeryd–Hurva and Barkeryd–Hallsberg sections form the southern branch of the project (former Sydlänken). The Barkeryd–Oslo section forms the western branch. Both branches will have capacity of 1,200 MW.[5] Construction of the southern branch to be start in 2012 with completion in 2013. Construction of the western branch to be start in 2013 and it is expected to be completed in 2015.[4]

References

  1. ^ a b Western branch will not be built 2013-04-29 "Nordic Grid Master Plan 2008" (PDF). Nordel. March 2008: 28. Retrieved 2010-02-27. {{cite journal}}: Cite journal requires |journal= (help)
  2. ^ a b c "Svenska Kraftnät constructs the South-West Link" (Press release). Svenska Kraftnät. 2008-04-23. Retrieved 2010-02-27.
  3. ^ a b "Projektnytt nr 3" (PDF) (in Swedish). Svenska Kraftnät. 2009-10-22. Retrieved 2010-02-27. {{cite journal}}: Cite journal requires |journal= (help); Unknown parameter |trans_title= ignored (|trans-title= suggested) (help)
  4. ^ "Swedish interconnectors — Case No 39351. Background explanations submitted by Svenska Kraftnät regarding the offered commitments for this case" (PDF). Svenska Kraftnät. 2009-10-01: 29. Retrieved 2010-02-27. {{cite journal}}: Cite journal requires |journal= (help)