Symbion Thermal Power Station
Map
Location of Symbion Thermal Power Station in Rwanda
CountryRwanda
LocationNyamyumba
Coordinates1°48′09″S 29°16′50″E / 1.8025°S 29.2806°E / -1.8025; 29.2806
StatusPlanned
Commission date2018 (Expected)
Owner(s)Symbion Power
Thermal power station
Primary fuelMethane gas
Power generation
Nameplate capacity50 MW

Symbion Thermal Power Station is a proposed 50 MW methane gas-fired thermal power plant located at the Cape of Busororo near the town of Nyamyumba in Rubavu District, in the Western Province of Rwanda.[1]

Location

The power station will be located at Cape Busororo, near Nyamyumba in Western Rwanda, approximately 163 kilometres (101 mi), by road, northwest of Kigali, the national capital and largest city in the country.[2] This location lies approximately 20 kilometres (12 mi), by road, south of Gisenyi, the provincial capital and nearest large town.[3]

Overview

Symbion Thermal Power Station is owned and operated by Symbion Power LLC, a private energy provider headquartered in the United States. The plant will consist of two facilities: (a) an off-shore installation which will extract, separate and process methane gas, which is dissolved in the deep waters of Lake Kivu, and then deliver it to (b) an on-shore generating facility located at Cape of Busororo, where the gas will be used to generate electricity.[4]

Symbion Thermal Power Station is the second methane gas powered power station in Rwanda, after KivuWatt Power Station, which generates 25MW and is in the process of expanding capcity to 100MW.[5]

See also

2

References

  1. ^ Press Release (8 August 2014). "Rwanda Awards 50MW Methane Gas To Electricity Project On Lake Kivu To US Symbion Power". Symbion Power. Retrieved 24 December 2015.
  2. ^ GFC (24 December 2015). "Road Distance Between Kigali And Nyamyumba With Route Marker". Globefeed.com (GFC). Retrieved 24 December 2014.
  3. ^ GFC (24 December 2015). "Map Showing Gisenyi And Nyamyumba With Route Marker". Globefeed.com (GFC). Retrieved 24 December 2015.
  4. ^ ESI Africa (11 August 2014). "Deal watch: Symbion Power to build methane plant in Rwanda". Esi-Africa.com. Retrieved 24 December 2015.
  5. ^ Esiara, Kabona (13 December 2015). "Rwanda adds 25MW from KivuWatt, Symbion signs methane deal". African Review. Nairobi. Retrieved 24 December 2015.