Jump to content

The Exchange 106

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Kitomi33 (talk | contribs) at 13:00, 3 December 2016. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

TRX Signature Tower
Map
Former namesMenara Platinum
General information
StatusUnder construction
TypeOffice
LocationTun Razak Exchange, Kuala Lumpur, Malaysia
Construction started2016
Estimated completion2018
Height
Architectural439 m (1,440 ft)[1]
Tip439 m (1,440 ft)[1]
Technical details
Floor count92
Design and construction
DeveloperMulia Group

TRX Signature Tower is a skyscraper under construction in Tun Razak Exchange, Kuala Lumpur. Developed by Mulia Group, construction began on 29 April 2016, and is set for completion in mid-2018.[2] If and when completed, the tower will be the tallest building in Kuala Lumpur,[3] and the third tallest building in Malaysia after KL118 and Petronas Twin Towers.[citation needed]

See also

References

  1. ^ a b TRX Signature Tower
  2. ^ "TRX tower likely in world's Top 20 tallest". The Rakyat Post. Kuala Lumpur, Malaysia. 30 April 2016. Retrieved 30 October 2016.
  3. ^ "Construction Begins on Signature Tower in Kuala Lumpur". CTBUH Global News. Kuala Lumpur, Malaysia. 3 May 2016. Retrieved 30 October 2016.