Jump to content

Tour des Canadiens Phase 2

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by JHCaufield (talk | contribs) at 02:43, 30 November 2016 (Added {{merge to}} tag to article (TW)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Tour des Canadiens phase 2 is currently under construction. Part of [Quad Windsor], a $2 billion dollar investment in [downtown Montreal] the tower will house 590 units, and will reach 170 metres in height.