Jump to content

USS Alloway (ID-3139)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Tom.Reding (talk | contribs) at 23:26, 24 February 2018 (Fix Category:Pages using deprecated image syntax (default size specified); WP:GenFixes on, using AWB). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

USS Alloway undergoing builder's trials on 5 July 1918, probably in San Francisco Bay. She is flying the flag of her builder, the Moore Shipbuilding Company of Oakland, California, from a short mast on her forecastle. The United States Shipping Board flag is flying from her forward mast, and a flag bearing her name is at the top of her after mast. Note the ship's "dazzle" camouflage scheme.
History
United States
Orderedas Shintaka
BuilderMoore & Scott, Oakland, California
Laid down1918
Launched1918
Acquired11 July 1918
Commissioned12 July 1918
Decommissioned3 March 1919
Stricken3 March 1919
Fatefate unknown
General characteristics
Displacement12,600 long tons (12,800 t)
Length416 ft 6 in (126.95 m)
Beam53 ft 0 in (16.15 m)
Draft27 ft 6 in (8.38 m) (aft)
Speed12+12 knots (23.2 km/h; 14.4 mph)
Complement70
Armament

USS Alloway (1918) was a cargo ship acquired by the U.S. Navy for transporting war materials in the Atlantic Ocean during World War I.

Shintaka, a screw steamer built in 1918 at Oakland, California by Moore & Scott, was acquired by the Navy on 11 July 1918, renamed Alloway (ID No. 3139), and commissioned at San Francisco, California on 12 July 1918. She was returned to the United States Shipping Board on 3 March 1919.

World War I service

Assigned to the Naval Overseas Transportation Service (NOTS), Alloway departed from San Francisco soon after commissioning and set a course for the west coast of South America. She arrived at Arica, Chile, on 17 August and began loading a cargo of nitrates. The cargo left Arica near the end of the month and arrived at Norfolk, Virginia, on 20 September. There, she discharged the nitrates at Norfolk and moved on to New York City for repairs.

Transporting Army cargo to France

On 10 November, the day before the armistice ended World War I, the Alloway, docked in New York, launched her only voyage to Europe. A little over a month later, on 11 December, the ship entered port at Quiberon, France. After unloading over 5,000 tons[vague] of U.S. Army cargo, Alloway continued on to Brest, France. There she loaded new cargo for the return voyage and entered New York Harbor on 13 February 1919. After discharging her cargo, Alloway entered Schewan's drydock for overhaul.

Post-war decommissioning

On 3 March 1919, she was placed out of commission and returned to the United States Shipping Board for disposition. Presumably, her name was struck from the Navy list that same day.

References