Jump to content

USS Casco (1864)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Ktr101 (talk | contribs) at 04:04, 21 January 2016 (removed Category:Ships built in Massachusetts; added Category:Ships built in Boston, Massachusetts using HotCat). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

USS Casco
The USS Casco on the James River, Virginia, 1865, while serving as a spar torpedo vessel. Note the torpedo gear mounted on her bow and the 11-inch (280 mm) Dahlgren smoothbore gun pivot-mounted on deck.
History
OrderedApril 1863
BuilderAtlantic Works, Boston
Cost$500,000
LaunchedMay 1864
ChristenedCasco
Commissioned4 December 1864
Decommissioned10 June 1865
RenamedHero
RefitTo spar torpedo vessel, June 1864
FateBroken up, 1875
General characteristics
Class and typeCasco-class light draft monitor
Displacement1,175
Length225 ft (69 m)
Beam45 ft (14 m)
Draught9 ft (2.7 m)
PropulsionSteam engine, twin screws
Speed9 knots (17 km/h)
Complement69 officers and enlisted
Armament1 × 11-inch (280 mm) Dalgren smoothbore cannon, 1 x spar torpedo
ArmorTurret 8-inch (200 mm), pilothouse 10-inch (250 mm), hull and deck 3-inch (76 mm)

The first USS Casco was the first of a class of twenty 1,175-ton light-draft monitors built by Atlantic Works, Boston, MA for the Union Navy during the American Civil War.

Launch and refitting

Upon her launching in May 1864, it was found that the design of these ships was seriously flawed. She was pronounced unseaworthy when nearly completed and on 25 June 1864 she was ordered to be converted to a torpedo vessel, without a turret or heavy guns. Casco was commissioned 4 December 1864, Acting Master C. A. Crooker in command.

The plans for the torpedo mechanism on the modified Casco-Class monitors.

John Ericsson developed the original design for the Casco class monitors, but Chief Engineer Alban C. Stimers, the General Inspector of Ironclads, elaborated it. When bids were requested for the ships, Assistant Secretary of the Navy Gustavus Fox wrote to Ericsson to confirm that Stimers had arranged the details with Ericsson’s approval. Ericsson replied that he had been kept in the dark and that Stimers had “frittered away” Ericsson’s principles, but in March 1863, Fox began to award contracts anyway. The vessels received another redesign in the aftermath of Rear Admiral Samuel F. Du Pont's failed attack on Charleston, SC, on 7 April 1863. Twenty vessels were ordered without serious scrutiny of the design. $14 million US was allocated for the construction of these vessels. It was discovered that Stimers and his assistant Theodore Allen had failed to compensate properly for the weight his revisions added to the original plan and this resulted in excessive stress on the hull and a freeboard of only 3 inches (76 mm). In June 1864, Stimers was removed from control of the project and Ericsson was called in to undo the damage. He was forced to raise the hulls of the monitors under construction by nearly two feet and the first few completed vessels had their turrets removed and a single pivot-mount 11 in (280 mm) Dahlgren cannon mounted. These same few vessels had a retractable spar torpedo added as well.

Potomac Flotilla

After completion of the additional yard work, Casco was towed to Hampton Roads in March 1865. She assisted in the removal of mines in the James River which made possible the advance of naval forces to Richmond, VA. In mid-April she was transferred to the Potomac Flotilla, with whom she served until the end of May. Casco was decommissioned 10 June 1865 at Washington Navy Yard. In the widespread ship-renamings that took place in June 1869, Casco was given the new name Hero. She saw no further active service, and she was broken up in April 1875.

See also

  • See USS Hero for other ships of this name.

References