USS Reprisal (CV-35)
Appearance
CV-35 Reprisal after construction suspended
| |
History | |
---|---|
United States | |
Name | Reprisal |
Ordered | 7 August 1942 |
Builder | New York Naval Shipyard |
Laid down | 1 July 1944 |
Launched | 14 May 1945 |
Fate | Sold for scrap 2 August 1949 to Boston Metals company |
General characteristics | |
Class and type | Template:Sclass- |
Displacement | Template:Essex class aircraft carrier displacement |
Length | Template:Essex class aircraft carrier length |
Beam | Template:Essex class aircraft carrier beam |
Draft | Template:Essex class aircraft carrier draught |
Propulsion | Template:Essex class aircraft carrier propulsion |
Speed | Template:Essex class aircraft carrier speed |
Range | Template:Essex class aircraft carrier range |
Complement | Template:Essex class aircraft carrier complement |
Armament | Template:Essex class aircraft carrier armament |
Armor | Template:Essex class aircraft carrier armour |
Aircraft carried | Template:Essex class aircraft carrier aircraft |
USS Reprisal CV-35 was a planned member of the Template:Sclass-s of World War II. Due to hostilities lessening in the Pacific Theatre and a multitude of other Essex carriers available, construction was cancelled on August 12, 1945 when she was about 52.3% completed. She was launched later that year to clear the slipway and perform bomb damage assessment. Plans were drawn up to complete her as an attack carrier but the plan was ultimately dropped and she was sold for scrap in 1949.[1]
References
- ^ "NavSource Online: Aircraft Carrier Photo Archive – REPRISAL (CV-35)". Navsource.org. Retrieved 2015-07-21.
{{cite web}}
: Unknown parameter|deadurl=
ignored (|url-status=
suggested) (help)