Jump to content

User:Gyan4u

From Wikipedia, the free encyclopedia

N.W.D.T. Award:

[edit]

NVDA Narmada Valley Development Authority (NVDA), is an organization of Govt. of M.P. constituted for planning water resources development in Narmada basin and expeditious implementation of projects . NVDA was constituted vide notification No. 501-2-NVDA-XXVII-83 dtd 16-7-1985 was published in Madhya Pradesh Gazette dated 9 Aug' 1985.

The Narmada Valley Development Authority is a multidisciplinary organization of the State Government and its head office is at Bhopal. The NVDA shall have jurisdiction over the major water resources development projects in the Narmada Basin.

NARMADA BASIN

Narmada is the fifth largest river in India and largest west flowing river of Indian peninsula originating from Maikala ranges at Amarkantak in Madhya Pradesh at an elevation of 900 m . It flows westwards over a length of 1,312 km before draining into the Gulf of Cambay, 50 km west of Bharuch city. The basin lies between east longitudes 72° 32 and 81° 45' and north latitudes 21° 20' and 23° 45'. Vindhya hills in the north, Satpura ranges in the south, Maikala ranges in the east and the Arabian sea in the west form the boundaries of the basin. The basin has an elongated shape almost like a thin ribbon with a maximum length of 953 km east to west and a maximum width of 234 km north to south. The first 1,077 km of the river flows in Madhya Pradesh and the next 35 km stretch of the river forms the boundary between the State of Madhya Pradesh and Maharashtra. Again for the next 39 km, it forms the boundary between Maharashtra and Gujarat. The last stretch of 161 km lies in Gujarat. Out of the total Catchment area of about 1 Lakh sq. km 87% lies in Madhya Pradesh, 2% in Maharashtra and 11% in Gujarat.

narbasin

Narmada River is known as the "Life Line" of Madhya Pradesh. It originates in Amarkantak, District Shahdol and of its total length of 1312 up to Arabian Sea, it runs for about 1112 km in the State of Madhya Pradesh. 87% of Basin lies in Madhya Pradesh covering the Districts, Shahdol, Balaghat, Rajnandgaon, Mandla, Seoni, Dindori, Katni, Jabalpur, Damoh, Sagar, Narsinghpur, Chhindwara, Betul, Hoshangabad, Harda, Raisen, Sehore, Khandwa, Indore, Dewas , Khargone, Dhar, Jhabua, & Barwani.

The annual utilisable quantity of water of Narmada at Navagam, in Gujarat, was estimated to be 34.537 million cubic metre (MCM) 28 million acre feet, at 75% dependability by NWDT. On full development, the Narmada has a potential of irrigating over 6 million ha (15 million acres) of land along with a capacity to generate about 3,000 Mega Watt of hydro electric power.

Narmada Water Disputes Tribunal vide its award of December 1979 has fixed share of water of each state as under.-

State MAF
Madhya Pradesh 18.25
Gujarat 9.00
Rajasthan 0.50
Maharashtra 0.25
Total 28.00

The allocation is proposed to be reviewed in the year 2025 and it may be reallocated in case States fail to utilize their share of water. Keeping in view the above situation the State Government is determined to develop use of 18.25 MAF of water by the year 2024-2025.

It is planned in the Master Plan (1972) to construct 29 major, 135 medium and over 3,000 minor projects to utilize the allocated water of 18.25 MAF of Madhya Pradesh. The Narmada Valley Development Department (NVDD) is entrusted with implementation of the major projects in the Narmada basin. The NVDD has constituted the multi-disciplinary Narmada Valley Development Authority (NVDA), in July 1985, dealing with, in all, 18 subjects of the line departments. The set up of NVDA at the head quarters is given in the chart. As development of irrigation under major projects requires a period of 5 to 6 years. it is planned to complete the 29 major projects by the year 2025 to provide irrigation to 14 lakh ha., using 11.36 MAF water. In addition, power generation of 3291 MW will also be possible.

Table below provide details on the major dams and canals being planned on the Narmada Basin by NVDA

S. No. Name of Project Benefits Power Irrigation
'(Lakh ha.) ' '(MW) ' 'Mcum) '
Completed Projects
1 Tawa 2.469 13.50 2386.72
2 Barna 0.548 559.82
3 Kolar 0.451 435.90
4 Sukta 0.166 170.57
5 Matiari (Dhobatoria) 0.101 88.38
6 Man Project 0.15 140.00
7 Jobat Project 0.098 112.00
Ongoing Projects
8 Rani Awanti Bai Sagar 1.57 100.00 1008.00
Bargi Diversion 2.45 1853.10
9 Indirasagar Project 1.23 1000.00 1674.00
Canal Power House of ISP 15.00
10 Omkareshwar Project 1.47 520.00 1300.00
11 Punasa lift 0.323 105.00
12 Upper Beda 0.099 90.00
Proposed Projects
13 Upper Narmada 0.185 178.93
14 Upper Burhner 0.098 82.72
15 Halon 0.117 134.00
16 Ataria 0.129 112.36
17 Chinki 0.708 1969.90
18 Sher 0.647 567.96
19 Machchrewa
20 Shakkar
21 Dudhi 0.506 444.49
22 Morand 0.522 465.48
23 Ganjal
24 Lower Goi 0.137 133.00
25 Raghavpur 20
26 Rosara 25
27 Basaniyar 20
28 Sitareva 15



Chairman
testVice Chairmantest1