User:Raj Fra/sandbox
Appearance
History
[edit]The roadway was proposed and constructed in two distinct segments. The first segment, between I-89 and Central Vermont Medical Center, was proposed and constructed in tandem with the Interstate, being opened to traffic by 1970. At that time, there was no plan to assign a route number to it.