Jump to content

Yulin–Tieshangang railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Garuda3 (talk | contribs) at 21:48, 13 February 2021 (adding simplified chinese). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Yulin–Tieshangang railway
Overview
StatusOperational
Termini
Service
TypeHeavy rail
History
Opened27 September 2020
Technical
Line length131.7 km (82 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification50 Hz 25,000 V
Operating speed160 km/h (99 mph)

The Yulin–Tieshangang railway (Simplified Chinese: 玉铁铁路) is a single-track electrified railway in China. The combined passenger and freight line is 131.7 kilometres (81.8 mi) long and has a design speed of 160 kilometres per hour (99 mph).[1]

History

Construction began in September 2010. Tracklaying began on 20 September 2012. It began operation on 6 May 2015.[1][2]

On 1 April 2016, a passenger service was introduced between Yulin railway station and Bobai railway station.[3]

References

  1. ^ a b "玉铁铁路". Guangxi Railway Investment Group Co,. Ltd. 27 January 2016. Retrieved 14 December 2020.{{cite web}}: CS1 maint: url-status (link)
  2. ^ "玉铁铁路全线铺通 贯穿3市3区4县设12个站(图)". Sina. 4 December 2013.{{cite web}}: CS1 maint: url-status (link)
  3. ^ "博白火车站介绍_火车票网". search.huochepiao.com. Retrieved 2020-12-14.