Clinchfield Railroad

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Mackensen (talk | contribs) at 17:43, 13 January 2008 (→‎References: -template). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Clinchfield Railroad
Overview
HeadquartersJohnson City, Tennessee / Erwin, Tennessee
Reporting markCCO; CRR
LocaleSpartanburg, South Carolina to Elkhorn City, Kentucky
Dates of operation19021983
SuccessorSeaboard System

The Clinchfield Railroad (reporting mark CRR) was an operating and holding company for the Carolina, Clinchfield and Ohio Railway (reporting mark CCO). The line ran from the coalfields of Virginia and Elkhorn City, Kentucky to the textile mills of South Carolina. The 35-mile segment from Dante, Virginia to Elkhorn City, opening up the coal lands north of Sandy Ridge Mountains and forming a connection with the Chesapeake and Ohio Railway at Elkhorn City, was completed in 1915. The Clinchfield was the last Class I railroad built in the U.S. east of the Rocky Mountains. The 266-mile railroad provided access to numerous scenic wonders of the Appalachian region and is probably best-known for the state-of-the-art railroad engineering techniques applied in its construction, as exemplified by the Clinchfield Loops climbing the Blue Ridge Mountains north of Marion, North Carolina. The Clinchfield Railroad began operating the line December 1, 1924, and for many years it was leased jointly by the Atlantic Coast Line Railroad and Louisville and Nashville Railroad. When the L&N merged with the ACL's successor, the Seaboard Coast Line Railroad, on December 29, 1982, forming the Seaboard System Railroad, the separate operating company was unnecessary and was dissolved. The line is now owned and operated by CSX Transportation as their Blue Ridge Subdivision (Spartanburg to Erwin, Tennessee) and Kingsport Subdivision (Erwin to Elkhorn City).

History

In 1886, Ex-Union General John H. Wilder received a charter for Charleston, Cincinnati and Chicago Railroad, commonly referred to as the "3-C" Railroad. This was the beginning of the modern Clinchfield. The promoters of this ambitious project proposed a 625-mile line from Ironton, Ohio, to Charleston, South Carolina, with an extension down the Ohio River to Cincinnati. It would serve the rich agricultural lands of the Piedmont, the summer resorts of the North Carolina mountains, the rich timber and mineral deposits and coal fields of Virginia and Kentucky, with terminals on both the Ohio River and the Atlantic seacoast. The estimated cost was $21 million. Johnson City, Tennessee was established as the headquarters for the 3-C railroad and that city became a railway boom town.

Construction progressed from Johnson City to both the north and south. Tracks reached Erwin, Tennessee in 1890. The roadway grading was 90% complete from Johnson City to Dante, Virginia, in 1893, when the 3-C began to experience financial problems and then failed in the national depression of that year. In July 1893, the assets of the 3-C railroad were sold at a foreclosure for $550,000. The new owners renamed it the "Ohio River and Charleston Railroad." The construction continued in a halfhearted manner and in 1897 owners began to sell off the railroad in segments.

At this time, an enterprising entrepreneur, George L. Carter, was involved in developing the coal lands of southwestern Virginia. He needed a railroad to transport his coal to a south Atlantic seaport. In 1902, he purchased the Ohio River and Charleston Railroad, renamed it the Clinchfield Railroad, and organized a gigantic construction program to get it completed. Between 1905 and 1909 the road was completed from Dante, Virginia, to Spartanburg, South Carolina. Carter was successful in getting adequate financing for the construction and built the railroad to construction standards far beyond the norms of the times. Consequently, Clinchfield has not had to reduce grades, lighten curves, straighten bridges, and enlarge tunnels to handle heavier and larger equipment as other railroads have had to do. Carter originally established the Clinchfield headquarters in Johnson City, Tennessee but later moved the headquarters to Erwin, Tennessee when he could not get required land for the main shops and classification yards.