Jump to content

Line 4 (Wuhan Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by ASDFGH (talk | contribs) at 23:04, 15 September 2017 (→‎Stations). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 4
 4 
Wangjiawan Station
Overview
OwnerWuhan
LocaleWuhan, China
Termini
Stations28
Service
TypeRapid transit
SystemWuhan Metro
Services1
Operator(s)Wuhan Metro Group Co., Ltd.
Rolling stockChinese Type B
History
Opened2013[1]
Technical
Line length33.23 km (20.65 mi)[2]
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Route map
Template:Infobox rdt

The Line 4 of Wuhan Metro (Chinese: 武汉地铁4号线) is the third line in Wuhan Metro system, and it will be the second metro line crossing the Yangtze river in Wuhan. It is colored grass-green, which is the identifying color of this line, which would appear on its trains, station signs, and the official subway map.

The whole construction was divided into two parts, being phase 1 and 2, which opened in 2013 and 2014, respectively. Phase 1, opened on December 28, 2013, runs through Wuchang in a northeast-southwest direction, connecting Wuhan Railway Station, Wuchang Railway Station and major commercial districts.[1] Phase 2 will run in an east-west direction, linking Hanyang and Wuchang, tunneling through the Yangtze river in the proximity of the first Yangtze river bridge and connecting with phase 1 at Wuchang Railway station.[4]

The opening of phase 1 of Line 4 will form the skeleton of Wuhan's metro system. Right after its opening, the system (including Line 1, 2, and 4) will be able to accommodate millions of passengers a day, where a large proportion of them will be the cross-Yangtze passengers. But all stations on line 4 have been designed only to accommodate a six-car train (type B) in length and have no possibility to extend for future upgrading.

Overview

File:Route Map of Line 4, Wuhan Metro.png
Map of Line 4 with the under construction western section
Tunnels under construction

History

  • Phase 1 opened on December 28, 2013.[5]
  • Phase 2 opened on December 28, 2014.[6]
Segment Date opened Length
Wuchang — Wuhan 28 December 2013 17.974 km (11.17 mi)
Huangjinkou — Wuchang 28 December 2014 15.429 km (9.59 mi)

Stations

Entrance of Metro

Phase 1 stations are (from south to north): Wuchang Railway Station, Meiyuanxiaoqu, Zhongnanlu, Hongshan Guangchang, Zhoujiadawan, Qingyuzui, Dongting, Yuejiazui, Tiejicun, Luojiagang, Yuanlilu, Gongye Dadao, Gongyesilu, Yangchunhu, Wuhan Railway Station.

Phase 2 stations are (from west to east): Huangjinkou, Mengjiapu, Yong'antang, Meiguiyuan, Wangjiawan, Shilipu, Qilimiao, Wulidun, Hangyang Railway Station, Zhongjiacun, Lanjianglu, Fuxinglu, Shouyilu. (Connect Wuchang Railway Station of phase 1.)

(station names might change according to official system map and schedule).

Station name Connections Distance
km
Location
English Chinese
Huangjinkou 黄金口 0.000 0.000 Hanyang
Mengjiapu 孟家铺 2.762 2.762
Yong'antang 永安堂 1.479 4.241
Yulong Road 玉龙路 1.243 5.484
Wangjiawan 王家湾  3  0.901 6.385
Shilipu 十里铺 0.950 7.335
Qilimiao 七里庙 1.204 8.539
Wulidun 五里墩 1.124 9.663
Hanyang Railway Station 汉阳火车站 China Railway HYN 1.012 10.675
Zhongjiacun 钟家村  6  1.573 12.248
Lanjiang Road 拦江路 0.834 13.082
Fuxing Road 复兴路 3.278 16.360 Wuchang
Shouyi Road 首义路 0.718 17.078
Wuchang Railway Station 武昌火车站 China Railway China Railway High-speed WCN 0.896 17.974
Meiyuanxiaoqu 梅苑小区 0.900 18.874
Zhongnan Road 中南路  2  1.095 19.969
Hongshan Square 洪山广场  2  0.966 20.935
Chuhe Hanjie 楚河汉街 1.077 22.012
Qingyuzui 青鱼嘴 1.226 23.238
Dongting 东亭 1.048 24.286
Yuejiazui 岳家嘴 0.928 25.214 Wuchang/Hongshan
Tieji Road 铁机路 1.032 26.246 Hongshan
Luojiagang 罗家港 1.171 27.417
Yuanlin Road 园林路 1.036 28.453
Renhe Road 仁和路 1.333 29.786
Gongye 4th Road 工业四路 1.634 31.420
Yangchunhu 杨春湖 1.173 32.593
Wuhan Railway Station 武汉火车站 China Railway High-speed WHN 0.810 33.403

Rolling stock

Type Time of manufacturing Cars Assembly Notes
Type B 2012–2013 90 Tc+M+M+M+M+Tc Manufactured by Zhuzhou Electric Locomotive Co., Ltd.

The rolling stock for Line 4 is a 6-car train, with 100 km/h of max speed, 80 km/h of operation max speed, and 36.6 km/h average speed. The collection shoe is on the lower part of the vehicle. The third rail is a mix of steel and aluminum. A full train provides 176 seats, and can carry 1276 passengers by Chinese regulation of 9 people per square meter.[7][8]

See also

References

  1. ^ a b "地铁4号线昨日开通 武汉地铁网络时代开启". Retrieved 2013-12-28.
  2. ^ "武汉地铁4号线二期全线洞通 汉阳将进地铁时代". Retrieved 2014-08-06.
  3. ^ "武汉轨道交通最高客流". Retrieved 2013-05-01.
  4. ^ 武汉步入立体交通时代 2015年建成六桥一隧三地铁 (in Chinese). 荆楚网. 2008-12-22. Retrieved 2010-01-23.
  5. ^ 武汉地铁4号线通车首日迎送七万市民
  6. ^ 地鐵4號綫二期12月28日試運營 結束漢陽無地鐵歷史 (in Chinese). 荊楚網. Retrieved 2014-12-11.
  7. ^ 严运涛 (2011-08-19). 武汉4亿元购买地铁4号线列车 (in Chinese). 荆楚网. Retrieved 2011-08-20.
  8. ^ 汪天明 (2011-08-19). 武汉4亿元采购90列车 装备地铁4号线 (in Chinese). 新华网. Retrieved 2011-08-20.