Jump to content

Beijing Fengtai railway station

From Wikipedia, the free encyclopedia
(Redirected from 北京丰台站)
Beijing Fengtai

北京丰台
China Railway
China Railway High-speed
South facade in June 2022
General information
Other namesFengtai (1896-2021)
LocationWanhua North Street / Fengfan East Road, Fengtai District, Beijing
Coordinates
Operated byChina Railway Beijing Group (National Railway Station)
Line(s)Beijing–Shanghai railway
Fengtai–Shacheng railway
Beijing–Guangzhou high-speed railway
Beijing–Guangzhou railway
Beijing-Kowloon Railway
Beijing–Shangqiu high-speed railway (Planned)
Platforms17
Tracks32
Other information
Station code10025 (TMIS)
FTP (telegram)
BJT (pinyin)
ClassificationTop Class station (特等站)
History
Opened
  • 1896[1] (old railway station)
  • 20 June 2022 (2022-06-20)[2][3] (new railway station)
Closed19 June 2010 (2010-06-19) (old railway station)
Services
Preceding station China Railway Following station
Beijing South
towards Beijing
Beijing–Shanghai railway Huangcun
towards Shanghai

Beijing Fengtai railway station[4] (Chinese: 北京丰台站; pinyin: Běijīng Fēngtái zhàn) is a railway station located in the Fengtai District of Beijing. It was renamed from Fengtai railway station to Beijing Fengtai railway station in 2021.[4] The new railway station opened on 20 June 2022.[2][3]

The new railway station is served by both high-speed and conventional-speed railways,[3][5] including Beijing–Guangzhou high-speed railway, Beijing–Guangzhou railway.[6] The station is the largest in Asia, with departure lounges, restaurants and other amenities spread across 400,000 square meters. At its peak, the station will be able to host 14,000 passengers per hour on a mix of bullet and regular trains as well as subway lines.

History

[edit]

Construction on the original station began in 1895, and it was opened in 1896.[1] Passenger services ceased on 19 June 2010.[7] The station has been closed since June 2010 in preparation for the construction of the new Fengtai railway station, which is expected to have a similar scale to Beijing South railway station.[8]

A metro station on Line 10 of the Beijing Subway was opened here on 5 May 2013.[9]

The construction of the new station was officially started in mid 2018 and the new railway station was expected to open in 2020 for conventional-speed railway,[5] and in 2021 for high-speed railway.[5] The opening of the new station was delayed until 20 June 2022 when it opened for both conventional-speed and high-speed railway.[2][3]

Layout

[edit]

China Railway

[edit]

The station has 12 platforms for high-speed trains (consisting of 6 islands) directly above 20 platforms for conventional services (consisting of 9 islands and 2 side platforms).[10][11]

Beijing Subway

[edit]
Fengtai Railway Station[12]

丰台站
Beijing Subway
Line 10 platform

Line 16 platform
General information
LocationFengtai District, Beijing
China
Coordinates39°50′59″N 116°18′16″E / 39.849639°N 116.30454°E / 39.849639; 116.30454 (Line 10 station)
Operated byBeijing Mass Transit Railway Operation Corp., Ltd (Line 10)
MTR Beijing (Line 16)
Line(s)     Line 10
     Line 16
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
History
Opened
May 5, 2013; 11 years ago (2013-05-05) (Line 10)

December 31, 2022; 22 months ago (2022-12-31) (Line 16)

Services
Preceding station Beijing Subway Following station
Capital Univ. of Economics & Business
outer loop / anticlockwise
Line 10 Niwa
inner loop / clockwise
Dongguantounan
towards Bei'anhe
Line 16 Fengtai Nanlu
towards Wanpingcheng
Location
Fengtai Railway Station[12] is located in Beijing
Fengtai Railway Station[12]
Fengtai Railway Station[12]
Location in Beijing

Fengtai railway station is served by Line 10 and Line 16 of the Beijing Subway.[12][13][14] Both the line 10 and line 16 stations have underground island platforms. The station has 3 exits, lettered C1, C2, and D. Exit C1 is accessible via an elevator.

References

[edit]
  1. ^ a b "期待!百年老站的华丽转身". Archived from the original on 2021-02-28.
  2. ^ a b c "Beijing's Fengtai Railway Station reopens". 2022-06-20. Archived from the original on 2022-06-20. Retrieved 2022-06-20.
  3. ^ a b c d "6月20日起实行新列车运行图,多趟赴京列车调整为北京丰台站终到始发". Archived from the original on 2022-06-16.
  4. ^ a b "北京丰台站站名字牌吊装完成". 2021-11-12. Archived from the original on 2021-11-13.
  5. ^ a b c "新丰台站正式开工 将成北京重要交通枢纽". 2018-09-09.
  6. ^ "北京丰台站6月20日开通运营 公交地铁等多种交通方式接驳就绪". 2022-06-19. Retrieved 2022-06-19. 6月20日,承担京广高铁、京广线、京九线等列车始发终到作业的北京丰台站开通运营
  7. ^ Liu Zening (刘泽宁) (2010-06-20). 115岁北京丰台火车站改扩建 200人捧场末班车. Tencent (QQ) News. Retrieved 2013-07-19.
  8. ^ 京石客运专线下半年建成 丰台火车站成高铁总站 [The Beijing-Shijiazhuang Passenger Railway will be completed in the second half of the year. Fengtai Railway Station to become the main high-speed train station.]. Huochepiao (in Chinese). July 27, 2012. Archived from the original on 2013-01-07.
  9. ^ 北京第二条地铁环线10号线5月5日日正式贯通运营. 163.com news. Xinhua News. 2013-05-05. Retrieved 2013-05-05.
  10. ^ "17台32线!亚洲最大铁路枢纽客站北京丰台站将启用". 2022-05-16. Archived from the original on 2022-06-16. 其中地面普速车场规模为11台20线,高架高速车场规模为6台12线
  11. ^ "丰台火车站改建工程施工总平面图及丰台站周边交通规划、产业规划". QQ (in Chinese). 2020-06-02. Archived from the original on 2021-05-09. Retrieved 2021-05-09.
  12. ^ a b "JPG格式线路图下载 北京地铁官方网站". Archived from the original on 2022-12-31.
  13. ^ 地铁10号线二期I段设计方案敲定 [Section I of Line 10 Phase II finalizing the design]. Capital Construction News (in Chinese). Beijing Municipal Commission of Housing and Urban-Rural Development. January 28, 2008. Archived from the original on 2014-11-01.
  14. ^ 北京地铁16号线车站设计方案展示. 2013-04-25. Archived from the original on 2013-10-07. Retrieved 2014-12-30.