Jump to content

Seville Metro: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Zorrobot (talk | contribs)
m robot Adding: sv:Sevillas tunnelbana
new pic
Line 2: Line 2:
{{Infobox Public transit|
{{Infobox Public transit|
name = Seville Metro|
name = Seville Metro|
image =|
image = MaparedMS.png|
imagesize = 180px|
imagesize = 250px|
locale = [[Seville]], [[Andalusia]], [[Spain]]|
locale = [[Seville]], [[Andalusia]], [[Spain]]|
transit_type = [[Rapid transit]]|
transit_type = [[Rapid transit]]|
Line 16: Line 16:
<br>
<br>
== Old project ==
== Old project ==
[[Image:AncentSevilleMetroMap.PNG|thumb|left|250px|Old metro project]]Construction of a metro in Seville began in [[1974]] with three proposed lines, covering only the city of Seville:
Construction of a metro in Seville began in [[1974]] with three proposed lines, covering only the city of Seville:


* '''Line 1:'''
* '''Line 1:'''
Line 28: Line 28:


== New project ==
== New project ==
[[Image:MaparedMS.png|thumb|right|350px|Seville Metro lines]]
[[Image:Estaciones de la L1.PNG|thumb|right|270px|Line 1]][[Image:VestibuloNervion.png|thumb|right|270px|Nervión station]]

[[Image:Estaciones de la L1.PNG|thumb|right|350px|Line 1]]


In [[1999]] a new metro project was started by the ''Seville Metro Corporation'' (in Spanish, ''Sociedad del Metro de Sevilla''), founded by a former mayor of Seville. It was scheduled to be completed in 2006, but as of June 2007 it has not been finished yet, the first line will be operating on December 20, 2008.
In [[1999]] a new metro project was started by the ''Seville Metro Corporation'' (in Spanish, ''Sociedad del Metro de Sevilla''), founded by a former mayor of Seville. It was scheduled to be completed in 2006, but as of June 2007 it has not been finished yet, the first line will be operating on December 20, 2008.
Line 37: Line 37:
<br>
<br>


[[Image:MetroSevilla L1-2.PNG|222x50px|Line 1]]
[[Image:MetroSevilla L1-2.PNG|150px|Line 1]]
* '''Line 1, West-South:''' Underground.
* '''Line 1, West-South:''' Underground.
** '''Stops:''' 22; Ciudad Expo, Cavaleri ([[Mairena del Aljarafe]]), San Juan Alto, San Juan Bajo ([[San Juan de Aznalfarache]]), Blas Infante, Parque de los Príncipes, Plaza de Cuba, Puerta de Jerez, Prado de San Sebastián, San Bernardo, Nervión, Gran Plaza, Mayo, Amate, La Plata, Cocheras, Guadaira, Pablo de Olavide (Seville), Condequinto, Montequinto, Europa, Olivar de Quinto ([[Dos Hermanas]]).
** '''Stops:''' 22; Ciudad Expo, Cavaleri ([[Mairena del Aljarafe]]), San Juan Alto, San Juan Bajo ([[San Juan de Aznalfarache]]), Blas Infante, Parque de los Príncipes, Plaza de Cuba, Puerta de Jerez, Prado de San Sebastián, San Bernardo, Nervión, Gran Plaza, Mayo, Amate, La Plata, Cocheras, Guadaira, Pablo de Olavide (Seville), Condequinto, Montequinto, Europa, Olivar de Quinto ([[Dos Hermanas]]).
Line 47: Line 47:
** '''License holder:''' [[Dragados]].
** '''License holder:''' [[Dragados]].
<br>
<br>
[[Image:MetroSevilla L2-2.PNG|222x50px|Line 2]]
[[Image:MetroSevilla L2-2.PNG|150px|Line 2]]
* '''Line 2, West-East.''' Underground.
* '''Line 2, West-East.''' Underground.
** '''Start of the works:''' [[2010]] (estimated)
** '''Start of the works:''' [[2010]] (estimated)
Line 53: Line 53:
** '''Number of stations: ''' 17
** '''Number of stations: ''' 17
<br>
<br>
[[Image:MetroSevilla L3-2.PNG|222x50px|Line 3]]
[[Image:MetroSevilla L3-2.PNG|150px|Line 3]]
* '''Line 3, North-South.''' Underground.
* '''Line 3, North-South.''' Underground.
** '''Start of the works:''' [[2010]] (estimated)
** '''Start of the works:''' [[2010]] (estimated)
Line 59: Line 59:
** '''Number of stations: ''' 17
** '''Number of stations: ''' 17
<br>
<br>
[[Image:MetroSevilla L4-2.PNG|222x50px|Line 4]]
[[Image:MetroSevilla L4-2.PNG|150px|Line 4]]
* '''Line 4, Semicircular.''' Street level.
* '''Line 4, Semicircular.''' Street level.
** '''Start of the works:''' [[2010]] (estimated)
** '''Start of the works:''' [[2010]] (estimated)

Revision as of 10:36, 17 November 2008

Template:Future public transportation

Seville Metro
Overview
LocaleSeville, Andalusia, Spain
Transit typeRapid transit
Number of lines1
Number of stations22 (List)
Operation
Began operationDecember 20, 2008
Operator(s)Metro de Sevilla
Technical
System lengthTemplate:Km to mi

The Seville metro (Metro de Sevilla in Spanish) is a light metro network currently under construction in the city of Seville, Spain and its metropolitan area. The system is totally independent from other traffic, rail or street traffic, every stations have got platform screen doors.

Old project

Construction of a metro in Seville began in 1974 with three proposed lines, covering only the city of Seville:

  • Line 1:
    • Stops: La Plata, Puerta Jerez, Plaza Nueva, Plaza del Duque, Alameda, Macarena, Pino Montano.
  • Line 2:
    • Stops: Santa Clara, Polígono San Pablo, Alhóndiga, Plaza del Duque, Marqués de Paradas, El Tardón, Rubén Darío.
  • Line 3:
    • Stops: Heliópolis, San Bernardo, Menéndez y Pelayo, Recaredo, Macarena, Cartuja.

This project was canceled in 1983, after construction had begun on some of the tunnels, due to fears that historic buildings might be damaged. The economic viability of the metro was also questionable in a city whose population had not grown as much as predicted.

New project

File:Estaciones de la L1.PNG
Line 1
Nervión station


In 1999 a new metro project was started by the Seville Metro Corporation (in Spanish, Sociedad del Metro de Sevilla), founded by a former mayor of Seville. It was scheduled to be completed in 2006, but as of June 2007 it has not been finished yet, the first line will be operating on December 20, 2008.

The new project plans a network covering Seville and its metropolitan area (1,500,000 inhabitants) formed by four lines, all of them, completely independents from other traffic:

Line 1

  • Line 1, West-South: Underground.
    • Stops: 22; Ciudad Expo, Cavaleri (Mairena del Aljarafe), San Juan Alto, San Juan Bajo (San Juan de Aznalfarache), Blas Infante, Parque de los Príncipes, Plaza de Cuba, Puerta de Jerez, Prado de San Sebastián, San Bernardo, Nervión, Gran Plaza, Mayo, Amate, La Plata, Cocheras, Guadaira, Pablo de Olavide (Seville), Condequinto, Montequinto, Europa, Olivar de Quinto (Dos Hermanas).
    • Length: 19 Km.
    • Number of trains: 17, manufactured by CAF.
    • Number of stations: 22.
    • Start of the works: Late 2003.
    • End of the works: Initially mid 2006, currently late 2008 (estimated).
    • License holder: Dragados.


Line 2

  • Line 2, West-East. Underground.
    • Start of the works: 2010 (estimated)
    • Length: 12 Km.
    • Number of stations: 17


Line 3

  • Line 3, North-South. Underground.
    • Start of the works: 2010 (estimated)
    • Length: 11 Km.
    • Number of stations: 17


Line 4

  • Line 4, Semicircular. Street level.
    • Start of the works: 2010 (estimated)
    • Length: 15 Km.
    • Number of stations: 19


Tram lines

  • MetroCentro (T1), surface tram by the center of Seville: Street level.
    • Stops: Amador de los Ríos, Ponce de León, Encarnación, Plaza de la Magdalena, Plaza Nueva, Archivo de Indias, San Fernando, Carlos V.
    • Length: 2.7 km.
    • Number of trains: 7, manufactured by CAF.
    • Start of the works: Mid 2005.
    • End of the works: Spring/Summer 2007 (Only Carlos V-San Fernando-Archivo de Indias-Plaza Nueva stations)


See also