Jump to content

Seri Saujana Bridge: Difference between revisions

Coordinates: 2°54′48.6″N 101°40′35.1″E / 2.913500°N 101.676417°E / 2.913500; 101.676417
From Wikipedia, the free encyclopedia
Content deleted Content added
coordinates
Line 15: Line 15:
| designer = PJS International
| designer = PJS International
| builder = [[Road Builder|Road Builder (M) Holdings Berhad]]
| builder = [[Road Builder|Road Builder (M) Holdings Berhad]]
| coordinates = {{coord|2|54|48.6|N|101|40|35.1|E|type:landmark|display=inline,title}}
}}
}}
The '''Seri Saujana Bridge''' is a main bridge in [[Putrajaya]], the Malaysian federal administrative capital. The bridge's design is unique [[cable-stayed bridge|cable-stayed]] [[arch bridge]].
The '''Seri Saujana Bridge''' is a main bridge in [[Putrajaya]], the Malaysian federal administrative capital. The bridge's design is unique [[cable-stayed bridge|cable-stayed]] [[arch bridge]].

Revision as of 17:48, 14 March 2010

Seri Saujana Bridge

Jambatan Seri Saujana
Coordinates2°54′48.6″N 101°40′35.1″E / 2.913500°N 101.676417°E / 2.913500; 101.676417
CarriesMotor vehicles, Pedestrians
CrossesPutrajaya Lake
LocaleLebuh Sentosa, Putrajaya
Official nameSeri Saujana Bridge
Maintained byPerbadanan Putrajaya
Characteristics
Designcable-stayed arch bridge
Total length300 m
Width32 m
Longest span300 m
History
DesignerPJS International
Constructed byRoad Builder (M) Holdings Berhad
Opened2003
Location
Map

The Seri Saujana Bridge is a main bridge in Putrajaya, the Malaysian federal administrative capital. The bridge's design is unique cable-stayed arch bridge.

Seri Saujana connects the Core Island (Precinct 4) to the Precinct 7 on Lebuh Sentosa highway and is strategically located at the main entrance into the Core Island from the south via the upgraded B15 road (now Putrajaya-Cyberjaya Expressway FT 29) and Kuala Lumpur-Putrajaya Expressway.

It is a new concept of the cable-stayed arch bridge. The bridge is controlled by the principal design parameters to reflect a transparent, elegant and futuristic slender looking structure, with an overall single span of 300m and total width of 32m. There are dual three lane carriageways. The deck level varies from RL 35.25m at abutment to RL 35m at centre of the bridge.

The builder of this bridge was Road Builder (M) Sdn Bhd at a cost of USD20 million. It was completed on 31st May 2003.

External links

Gallery