construction hasnt started, studies still underway
Rescuing 1 sources and tagging 0 as dead. #IABot (v1.2.6)
Line 78: Line 78:


==Overview==
==Overview==
There will be two power plants, each with an installed capacity of {{convert|800|MW}}; one on the Zambian side and another on the Zimbabwean side. The dam to supply the reservoir with water will be a {{Convert|181|m|abbr=on}} tall [[arch-gravity dam|arch-gravity]] type.<ref>{{cite web |title=Batoka Gorge Hydro-Power Project Profile |url=http://www.comesa.int/attachments/article/842/Batoka%20Gorge%20%20-%20Project%20Profile%20130526.pdf |publisher=Comesa |accessdate=7 March 2014}}</ref>
There will be two power plants, each with an installed capacity of {{convert|800|MW}}; one on the Zambian side and another on the Zimbabwean side. The dam to supply the reservoir with water will be a {{Convert|181|m|abbr=on}} tall [[arch-gravity dam|arch-gravity]] type.<ref>{{cite web|title=Batoka Gorge Hydro-Power Project Profile |url=http://www.comesa.int/attachments/article/842/Batoka%20Gorge%20%20-%20Project%20Profile%20130526.pdf |publisher=Comesa |accessdate=7 March 2014 |deadurl=yes |archiveurl=https://web.archive.org/web/20140307044658/http://www.comesa.int/attachments/article/842/Batoka%20Gorge%20%20-%20Project%20Profile%20130526.pdf |archivedate=7 March 2014 |df= }}</ref>


==Construction costs==
==Construction costs==

Revision as of 10:37, 28 October 2016

Batoka Gorge Dam
Batoka Gorge Hydroelectric Power Station is located in Zimbabwe
Batoka Gorge Hydroelectric Power Station
Location of Batoka Gorge Dam in Zimbabwe
CountryZambia/Zimbabwe
PurposePower
StatusProposed
Dam and spillways
Type of damArch gravity
ImpoundsZambezi River
Height181 m (594 ft)
Width (crest)12 m (39 ft)
Width (base)97.8 m (321 ft)
Spillway capacity20,000 m3/s (710,000 cu ft/s)
Reservoir
Total capacity1,680×10^6 m3 (1,360,000 acre⋅ft)
Catchment area508,000 km2 (196,000 sq mi)
Turbines8 x 200 MW (270,000 hp) Francis-type
Installed capacity1,600 MW (2,100,000 hp)

Batoka Gorge Hydroelectric Power Station is a 1,600MW hydroelectric power station, planned on the Zambezi River across the International border between Zambia and Zimbabwe.[1]

Location

The power station will be located on the Zambezi River, approximately 54 kilometres (34 mi), downstream of Victoria Falls.[2]

Overview

There will be two power plants, each with an installed capacity of 800 megawatts (1,100,000 hp); one on the Zambian side and another on the Zimbabwean side. The dam to supply the reservoir with water will be a 181 m (594 ft) tall arch-gravity type.[3]

Construction costs

The estimated construction costs are between US$2.5 to 3.0 billion.[4]

See also

References

  1. ^ Batoka Gorge Project To Ease Power Shortage
  2. ^ Batoka George Hydropower Station Located Downstream of Victoria Falls
  3. ^ "Batoka Gorge Hydro-Power Project Profile" (PDF). Comesa. Archived from the original (PDF) on 7 March 2014. Retrieved 7 March 2014. {{cite web}}: Unknown parameter |deadurl= ignored (|url-status= suggested) (help)
  4. ^ Construction Of Batoka Gorge Hydroelectric Power Stations To Start In 2014