The '''Infiernillo Dam''' ("Little hell"), also known as '''[[Adolfo López Mateos]] Dam''', is an [[embankment dam]] on the [[Balsas River]] near [[La Unión, Guerrero]], Mexico. The dam supports a [[hydroelectric]] power station containing six turbine-generators for a total installed capacity of 1,120 MW. The dam is {{Convert|149|m|ft|0|abbr=on}} high, {{Convert|344|m|ft|0|abbr=on}} long and is owned by [[Comisión Federal de Electricidad]]. Its first generator was operational on January 25, 1965.<ref>{{cite web|title=Hydroelectric|url=http://www.cfe.gob.mx/QuienesSomos/estadisticas/listadocentralesgeneradoras/Paginas/listadohidroelectricas.aspx|publisher=CFE|language=Spanish|accessdate=28 January 2011}}</ref><ref>{{cite web|title=Monografía: Descripción de la represa hidroeléctrica "EL INFIERNILLO|url=http://arandu.org.ar/pub/presahidroelectricaelinfiernillo.pdf|publisher=CONSTRUCCIONES HIDRÁULICA|accessdate=28 January 2011|language=Spanish|year=2001}}</ref> |
The '''Infiernillo Dam''' ("Little hell"), also known as '''[[Adolfo López Mateos]] Dam''', is an [[embankment dam]] on the [[Balsas River]] near [[La Unión, Guerrero]], Mexico. The dam supports a [[hydroelectric]] power station containing six turbine-generators for a total installed capacity of 1,120 MW. The dam is {{Convert|149|m|ft|0|abbr=on}} high, {{Convert|344|m|ft|0|abbr=on}} long and is owned by [[Comisión Federal de Electricidad]]. Its first generator was operational on January 25, 1965.<ref>{{cite web|title=Hydroelectric |url=http://www.cfe.gob.mx/QuienesSomos/estadisticas/listadocentralesgeneradoras/Paginas/listadohidroelectricas.aspx |publisher=CFE |language=Spanish |accessdate=28 January 2011 |deadurl=yes |archiveurl=https://web.archive.org/web/20110126213330/http://www.cfe.gob.mx/QuienesSomos/estadisticas/listadocentralesgeneradoras/Paginas/listadohidroelectricas.aspx |archivedate=26 January 2011 |df= }}</ref><ref>{{cite web|title=Monografía: Descripción de la represa hidroeléctrica "EL INFIERNILLO|url=http://arandu.org.ar/pub/presahidroelectricaelinfiernillo.pdf|publisher=CONSTRUCCIONES HIDRÁULICA|accessdate=28 January 2011|language=Spanish|year=2001}}</ref> |
||
Placement of the dam embankment began in August 1962, and on December 7, 1963, the dam was topped off. The diversion tunnels were closed and the reservoir began to fill on June 15, 1964.<ref>{{cite book|last=Marr|first=sponsored by The Geo-Institute of the American Society of Civil Engineers ; edited by W. Allen|title=A history of progress : selected U.S. papers in geotechnical engineering|year=2002|publisher=American Society of Civil Engineers|location=Reston, Virginia|isbn=0-7844-0656-1|url=https://books.google.com/books?id=vGCqACNvq7UC&pg=PA1524&lpg=PA1524&dq=Infiernillo+dam&source=bl&ots=Ex18NuHMX_&sig=2Whhn2tbxhI2dVF36CHJn0rxwB4&hl=en&ei=73lCTcucCcX0cN7vqNgN&sa=X&oi=book_result&ct=result&resnum=7&ved=0CEEQ6AEwBg#v=onepage&q=Infiernillo%20dam&f=false|page=1524}}</ref> |
Placement of the dam embankment began in August 1962, and on December 7, 1963, the dam was topped off. The diversion tunnels were closed and the reservoir began to fill on June 15, 1964.<ref>{{cite book|last=Marr|first=sponsored by The Geo-Institute of the American Society of Civil Engineers ; edited by W. Allen|title=A history of progress : selected U.S. papers in geotechnical engineering|year=2002|publisher=American Society of Civil Engineers|location=Reston, Virginia|isbn=0-7844-0656-1|url=https://books.google.com/books?id=vGCqACNvq7UC&pg=PA1524&lpg=PA1524&dq=Infiernillo+dam&source=bl&ots=Ex18NuHMX_&sig=2Whhn2tbxhI2dVF36CHJn0rxwB4&hl=en&ei=73lCTcucCcX0cN7vqNgN&sa=X&oi=book_result&ct=result&resnum=7&ved=0CEEQ6AEwBg#v=onepage&q=Infiernillo%20dam&f=false|page=1524}}</ref> |
Revision as of 19:56, 10 April 2017
Infiernillo Dam | |
---|---|
Official name | Presa Adolfo López Mateos |
Country | Mexico |
Location | La Unión, Guerrero |
Coordinates | 18°16′23″N 101°53′34″W / 18.27306°N 101.89278°W |
Status | In use |
Opening date | 1965 |
Owner(s) | Comisión Federal de Electricidad |
Dam and spillways | |
Height | 149 m (489 ft) |
Length | 344 m (1,129 ft) |
Width (base) | 570 m (1,870 ft) |
Dam volume | 5,500,000 m3 (194,230,667 cu ft) |
Reservoir | |
Creates | Infiernillo Reservoir |
Total capacity | 12,000,000,000 m3 (9,728,558 acre⋅ft) |
Power Station | |
Commission date | 1965 |
Installed capacity | 1,120 MW |
The Infiernillo Dam ("Little hell"), also known as Adolfo López Mateos Dam, is an embankment dam on the Balsas River near La Unión, Guerrero, Mexico. The dam supports a hydroelectric power station containing six turbine-generators for a total installed capacity of 1,120 MW. The dam is 149 m (489 ft) high, 344 m (1,129 ft) long and is owned by Comisión Federal de Electricidad. Its first generator was operational on January 25, 1965.[1][2]
Placement of the dam embankment began in August 1962, and on December 7, 1963, the dam was topped off. The diversion tunnels were closed and the reservoir began to fill on June 15, 1964.[3]
References
- ^ "Hydroelectric" (in Spanish). CFE. Archived from the original on 26 January 2011. Retrieved 28 January 2011.
{{cite web}}
: Unknown parameter|deadurl=
ignored (|url-status=
suggested) (help) - ^ "Monografía: Descripción de la represa hidroeléctrica "EL INFIERNILLO" (PDF) (in Spanish). CONSTRUCCIONES HIDRÁULICA. 2001. Retrieved 28 January 2011.
- ^ Marr, sponsored by The Geo-Institute of the American Society of Civil Engineers ; edited by W. Allen (2002). A history of progress : selected U.S. papers in geotechnical engineering. Reston, Virginia: American Society of Civil Engineers. p. 1524. ISBN 0-7844-0656-1.
{{cite book}}
:|first=
has generic name (help)CS1 maint: multiple names: authors list (link)