Cårrujavrit Hydroelectric Power Station: Difference between revisions
→See also: Added, w. {{stack|{{portal|Norway|Water|Renewable energy}}}} |
Rescuing 1 sources and tagging 0 as dead. #IABot (v1.5beta) |
||
Line 33: | Line 33: | ||
}} |
}} |
||
The '''Cårrujavrit Hydroelectric Power Station''' ({{lang-no|Cårrujavrit kraftverk}} or ''Čårrujavrit kraftverk''<ref>[https://www.regjeringen.no/no/dokumenter/verneplan-for-kvanangsbotn-og-navitdalen/id633556/ Verneplan for Kvænangsbotn og Navitdalen: Etablering av Kvænangsbotn og Navitdalen landskapsvernområder i Kvænangen Kommune, Troms Fylke. 2011. p. 7ff.]</ref>) is a [[hydroelectricity|hydroelectric]] [[power station]] in the municipality of [[Kvænangen]] in [[Troms]] [[Counties of Norway|county]], [[Norway]]. It utilizes a drop of {{convert|305|m|sp=us}} between its intake reservoir on the Njemenaiko River ({{lang-no|Njemenaikoelva}}, {{lang-fkv|Niemenaikunjoki}}, {{lang-se|Njemenjáikojohka}})<ref>[http://www.kvenskestedsnavn.no/stedsnavn/view/5901 Kvensk stedsnavndatabase: Niemenaikunjoki.]</ref> and Little Lakes ({{lang-no|Småvatnan}}, {{lang-fkv|Pikkujärvet}}, {{lang-se|Čorrojávrrit}}),<ref>[http://www.kvenskestedsnavn.no/stedsnavn/view/5968 Kvensk stedsnavndatabase: Pikkujärvet.]</ref> which is also the reservoir for the [[Kvænangsbotn Hydroelectric Power Station]]. [[Šuoikkatjávri|Lake Tjoika]] ({{lang-fkv|Sueikkajärvi}} or ''Hyttysenjärvi'', {{lang-se|Šuoikkatjávri}})<ref>[http://www.kvenskestedsnavn.no/stedsnavn/view/6110 Kvensk stedsnavndatabase: Sueikkajärvi.]</ref> serves as the reservoir for the plant and is regulated at a level between {{cvt|529|m|sp=us}} and {{cvt|516|m|sp=us}}. The plant has a [[Francis turbine]] and operates at an installed capacity of {{nowrap|1.7 [[Megawatt|MW]]}}, with an average annual production of about 11 GWh. The plant is controlled by Kvænangen Kraftverk AS, with a 48.2% share owned by Troms Kraft.<ref>[http://www.tromskraft.no/om/selskap/tkp/kraftverk Troms Kraft: Våre kraftverk.]</ref> |
The '''Cårrujavrit Hydroelectric Power Station''' ({{lang-no|Cårrujavrit kraftverk}} or ''Čårrujavrit kraftverk''<ref>[https://www.regjeringen.no/no/dokumenter/verneplan-for-kvanangsbotn-og-navitdalen/id633556/ Verneplan for Kvænangsbotn og Navitdalen: Etablering av Kvænangsbotn og Navitdalen landskapsvernområder i Kvænangen Kommune, Troms Fylke. 2011. p. 7ff.]</ref>) is a [[hydroelectricity|hydroelectric]] [[power station]] in the municipality of [[Kvænangen]] in [[Troms]] [[Counties of Norway|county]], [[Norway]]. It utilizes a drop of {{convert|305|m|sp=us}} between its intake reservoir on the Njemenaiko River ({{lang-no|Njemenaikoelva}}, {{lang-fkv|Niemenaikunjoki}}, {{lang-se|Njemenjáikojohka}})<ref>[http://www.kvenskestedsnavn.no/stedsnavn/view/5901 Kvensk stedsnavndatabase: Niemenaikunjoki.]</ref> and Little Lakes ({{lang-no|Småvatnan}}, {{lang-fkv|Pikkujärvet}}, {{lang-se|Čorrojávrrit}}),<ref>[http://www.kvenskestedsnavn.no/stedsnavn/view/5968 Kvensk stedsnavndatabase: Pikkujärvet.]</ref> which is also the reservoir for the [[Kvænangsbotn Hydroelectric Power Station]]. [[Šuoikkatjávri|Lake Tjoika]] ({{lang-fkv|Sueikkajärvi}} or ''Hyttysenjärvi'', {{lang-se|Šuoikkatjávri}})<ref>[http://www.kvenskestedsnavn.no/stedsnavn/view/6110 Kvensk stedsnavndatabase: Sueikkajärvi.]</ref> serves as the reservoir for the plant and is regulated at a level between {{cvt|529|m|sp=us}} and {{cvt|516|m|sp=us}}. The plant has a [[Francis turbine]] and operates at an installed capacity of {{nowrap|1.7 [[Megawatt|MW]]}}, with an average annual production of about 11 GWh. The plant is controlled by Kvænangen Kraftverk AS, with a 48.2% share owned by Troms Kraft.<ref>[http://www.tromskraft.no/om/selskap/tkp/kraftverk Troms Kraft: Våre kraftverk.] {{webarchive|url=https://web.archive.org/web/20151119040058/http://www.tromskraft.no/om/selskap/tkp/kraftverk |date=2015-11-19 }}</ref> |
||
==See also== |
==See also== |
Revision as of 08:39, 16 August 2017
Cårrujavrit Power Station | |
---|---|
Official name | Cårrujavrit kraftverk |
Country | Norway |
Location | Kvænangen, Troms |
Coordinates | 69°41′30″N 22°09′39″E / 69.69167°N 22.16083°E |
Status | Operational |
Commission date |
|
Owner(s) | Kvænangen Kraftverk AS |
Operator(s) | |
Tidal power station | |
Tidal range |
|
Power generation | |
Nameplate capacity | 1.7 MW |
Capacity factor | 73.9% |
Annual net output | 11 GW·h |
The Cårrujavrit Hydroelectric Power Station (Norwegian: Cårrujavrit kraftverk or Čårrujavrit kraftverk[1]) is a hydroelectric power station in the municipality of Kvænangen in Troms county, Norway. It utilizes a drop of 305 meters (1,001 ft) between its intake reservoir on the Njemenaiko River (Norwegian: Njemenaikoelva, Kven: Niemenaikunjoki, Northern Sami: Njemenjáikojohka)[2] and Little Lakes (Norwegian: Småvatnan, Kven: Pikkujärvet, Northern Sami: Čorrojávrrit),[3] which is also the reservoir for the Kvænangsbotn Hydroelectric Power Station. Lake Tjoika (Kven: Sueikkajärvi or Hyttysenjärvi, Northern Sami: Šuoikkatjávri)[4] serves as the reservoir for the plant and is regulated at a level between 529 m (1,736 ft) and 516 m (1,693 ft). The plant has a Francis turbine and operates at an installed capacity of 1.7 MW, with an average annual production of about 11 GWh. The plant is controlled by Kvænangen Kraftverk AS, with a 48.2% share owned by Troms Kraft.[5]
See also
References
- ^ Verneplan for Kvænangsbotn og Navitdalen: Etablering av Kvænangsbotn og Navitdalen landskapsvernområder i Kvænangen Kommune, Troms Fylke. 2011. p. 7ff.
- ^ Kvensk stedsnavndatabase: Niemenaikunjoki.
- ^ Kvensk stedsnavndatabase: Pikkujärvet.
- ^ Kvensk stedsnavndatabase: Sueikkajärvi.
- ^ Troms Kraft: Våre kraftverk. Archived 2015-11-19 at the Wayback Machine