Coastal Pacific
Overview | |||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Service type | Inter-city rail | ||||||||||||||||||||||||||||||||||||||||||
Status | Discontinued | ||||||||||||||||||||||||||||||||||||||||||
Locale | Upper South Island, New Zealand | ||||||||||||||||||||||||||||||||||||||||||
First service | 1988 | ||||||||||||||||||||||||||||||||||||||||||
Former operator(s) | InterCity Rail (1988–1995) Tranz Scenic (1995–2012) KiwiRail Scenic Journeys (2012–2017) The Great Journeys of New Zealand (2017–2021) | ||||||||||||||||||||||||||||||||||||||||||
Route | |||||||||||||||||||||||||||||||||||||||||||
Termini | Christchurch Picton | ||||||||||||||||||||||||||||||||||||||||||
Stops | 2 | ||||||||||||||||||||||||||||||||||||||||||
Distance travelled | 348 km (216 mi) | ||||||||||||||||||||||||||||||||||||||||||
Average journey time | 5 hours | ||||||||||||||||||||||||||||||||||||||||||
Service frequency | Tuesday, Wednesday, October - April | ||||||||||||||||||||||||||||||||||||||||||
On-board services | |||||||||||||||||||||||||||||||||||||||||||
Class(es) | Scenic Class, Scenic Plus Class | ||||||||||||||||||||||||||||||||||||||||||
Disabled access | Wheelchair hoist in café car | ||||||||||||||||||||||||||||||||||||||||||
Seating arrangements | Airline-style Alcove with table | ||||||||||||||||||||||||||||||||||||||||||
Catering facilities | On-board café | ||||||||||||||||||||||||||||||||||||||||||
Observation facilities | Large windows in all carriages Open-air viewing carriage | ||||||||||||||||||||||||||||||||||||||||||
Baggage facilities | Overhead shelves Baggage carriage | ||||||||||||||||||||||||||||||||||||||||||
Other facilities | Toilets | ||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||
Rolling stock | DXR locomotives AK class carriages | ||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,067 mm (3 ft 6 in) | ||||||||||||||||||||||||||||||||||||||||||
Operating speed | 66 km/h (41 mph) average | ||||||||||||||||||||||||||||||||||||||||||
|
The Coastal Pacific was a long-distance passenger train that ran between Picton and Christchurch in the South Island of New Zealand. It was operated by The Great Journeys of New Zealand division of KiwiRail.[1] It was called the TranzCoastal from May 2000 until temporarily withdrawn in February 2011.[2] It was the first train to use the new AK class carriages.
The service was suspended after 14 November 2016 due to damage to the rail line from the 2016 Kaikoura earthquake, but, in 2018-19 ran from Saturday 1 December to Sunday 28 April.[3] In November 2018 Prime Minister Jacinda Ardern announced $40 million for KiwiRail from the Provincial Growth Fund, to provide year-round service and to upgrade the Kaikoura, Blenheim and Picton stations.[4]
The service was again suspended on 23 March 2020 due to COVID-19 restrictions.[5]
The Coastal Pacific is discontinued as a same day long distance passenger service, but, may be replaced by a multi-day rail tour from July 2022.[6][7]
History
In 1988 the Railways Corporation announced it was replacing the Picton Express train from Christchurch to Picton with a new train along the lines of the successful TranzAlpine between Christchurch and Greymouth launched in 1987.[8]
On 25 September 1988, the train was re-launched as the "Coastal Pacific Express."[9] The new train eliminated the previous refreshment stop at Kaikoura and included a servery for refreshments.[10]
In April 2006, Toll NZ announced its intention to sell the TranzCoastal and the TranzAlpine.[11] However, with the purchase of Toll NZ's rail assets in 2008 by the government, these plans never came to fruition. KiwiRail has upgraded the remaining three long-distance passenger services.
Following the 6.3 magnitude earthquake that struck Canterbury on 22 February 2011, KiwiRail suspended the train, replacing it with a bus service until 10 April 2011.[12] They announced that it would return on 15 August 2011[13] under its original name, the Coastal Pacific.[14] Since 2013 the train has been run as a seasonal service, serving the peak tourist season between about September to April, with no services in the winter months, to offset operating losses.[15]
The 7.8 magnitude North Canterbury earthquake on 14 November 2016 caused numerous landslides that destroyed parts of the railway line in the Kaikoura district. KiwiRail suspended the train service, which had been due to operate until May 2017, for the rest of the 2016–17 season.[16] It was announced on 1 August 2018 that the service would resume on 1 December.[17][18]
As of 29 January 2022, the Coastal Pacific has discontinued same day passenger operations between Picton and Christchurch. [19]
Incidents
One of New Zealand Rail's most controversial safety incidents happened in 1994 when 6-year-old Morgan Jones fell under an observation carriage on the Coastal Pacific, after a handrail he was holding onto suddenly fell off. Although Jones survived the accident, he was left blind and had a leg amputated.[20][21]
Route and stations
The train ran daily between Christchurch and Picton, stopping at Rangiora, Kaikoura[22] along the Main North Line. It was introduced on Sunday, 25 September 1988 and took 5 hours 20 minutes.
Rolling stock
The initial rolling stock for the Coastal Pacific consisted of the last three originals Southerner day carriages. They were refurbished to the same design as the three AO class carriages on the TranzAlpine and the sole Connoisseur carriage.[10] Two carriages seated 51 each in the seats designed by Addington Workshops, which were reupholstered and re-arranged, alcove-style, around tables. The third carriage became a 31-seat servery/observation carriage fitted out similarly to its TranzAlpine counterpart, but with detail differences in the buffet counter area. An FM class guards van was fitted with an 11-kW petrol generator at the handbrake end for power and baggage duties.[10]
The new Coastal Pacific became a favourite with travellers, but it did not attract the same level of popularity as the TranzAlpine. In 1993, a "backpackers" car (a former red Picton – Greymouth car with luggage space at one end) was introduced, for a cheaper option. This premise proved popular, as did adding five freight wagons authorised to travel at 100 km/h conveying priority freight for the North Island or deep South.[citation needed]
In the early 1990s, the carriages were equipped with pressure ventilation like the Bay Express carriages and the TranzAlpine rear observation carriage.[citation needed]
Connoisseur service
On 19 January 1987, a private tourism firm leased a 29 (later 45) seat single-lavatory South Island Main Trunk first-class car refurbished in 1970 for the Southerner and attached it to the Picton train initially, before expanding its operation to Greymouth and later Invercargill. It was marketed as a luxury carriage: it offered the same level of comfort as other Southerner carriages, but the service was to a higher standard. Originally named the Connoisseurs' Express carriage, it was heavily refurbished to offer superior quality service and renamed The Connoisseur carriage.[citation needed]
Rebranding and re-equipping
During 1996, the original TranzAlpine observation carriage was thoroughly overhauled and air-conditioning installed, and this carriage, along with the two former Lynx Express carriages and the carriage with luggage space, were permanently assigned to this train. The backpackers' carriage was later replaced by the only former Southerner (later Northerner) carriage to escape rebuilding as a panorama carriage or scrapping. It was fitted with 47 of the same type of Addington seat that it had had in the mid to late 1980s, all seats facing toward the two centre tables, one on both sides of the aisle of the carriage, and became the new backpackers' carriage. The former Connoisseur carriage, thoroughly refurbished the year before with air conditioning installed, assumed regular duty. The Lynx Express baggage van and later the first of the NIMT baggage vans were also allocated to this service. Later, the second backpacker carriage had air conditioning installed, and in late 2003, it was transferred north for use on the Overlander or Wairarapa Connection.
The baggage van fitted out for the initial third NIMT passenger trainset in 1992 had its central and one end module converted into an open viewing area, while the other end module remained for luggage.
New rolling stock
KiwiRail's built new carriages for the service at Hillside Engineering, classed AK. The new carriages for the Coastal Pacific entered service toward the end of 2011.[14]
See also
- Lynx Express
- Main North Line (Picton-Christchurch)
References
- ^ "The Coastal Pacific: Between mountains and sea". The Great Journeys of New Zealand. Retrieved 21 June 2017.
- ^ Wheeler, Bob (11 October 2000). Chairman's Address to Shareholders, 2000 Annual Meeting. Wellington: Tranz Rail Holdings.
- ^ "The Coastal Pacific train is coming back!". Great Journeys of New Zealand. Retrieved 3 August 2018.
- ^ "$40 million for Coastal Pacific as first post-quake service marked in Kaikoura". Stuff (Fairfax). 23 November 2018.
- ^ "KiwiRail makes changes to services in response to COVID-19". KiwiRail. Retrieved 6 July 2020.
- ^ "Urgent calls for long-distance passenger services to stay as KiwiRail cuts operations". Newshub. Retrieved 29 January 2022.
- ^ "Project Restart '22". Great Journeys of New Zealand. Retrieved 11 December 2021.
- ^ "Tranz-Alpine Express Popular". New Zealand Railway Observer. 45 (2 (194)). New Zealand Railway and Locomotive Society: 75. Winter 1988. ISSN 0028-8624.
- ^ Churchman & Hurst 2001, p. 64.
- ^ a b c "Coastal Pacific Express". New Zealand Railway Observer. 45 (4 (196)). New Zealand Railway and Locomotive Society: 167. Summer 1988–1989. ISSN 0028-8624.
- ^ "Tranz Alpine journey up for grabs". Television New Zealand. 22 May 2006. Retrieved 24 September 2011.
- ^ BUTTERFIELD, TANIA (5 April 2011). "East coast rail service is stopped". The Marlborough Express. Blenheim: Fairfax New Zealand. Retrieved 22 July 2011.
- ^ GORMAN, PAUL (5 April 2011). "TranzCoastal off rails till August". The Press. Christchurch: Fairfax New Zealand. Retrieved 5 April 2011.
- ^ a b "TranzCoastal service resumes with new Coastal Pacific identity", Daily Express (104): 1, 2011
- ^ HERSELMAN, SVEN (5 May 2014). "All aboard for last run of the season". The Marlborough Express. Blenheim: Fairfax NZ News. Retrieved 5 May 2014.
- ^ "Disruption news". KiwiRail Scenic Journeys. Retrieved 23 November 2016.
- ^ "Coastal Pacific train service to return from December" (Press release). KiwiRail. 1 August 2018. Archived from the original on 3 August 2018. Retrieved 3 August 2018.
- ^ "Main North Line rebuild (project timetable)". KiwiRail. 2018.
- ^ "Urgent calls for long-distance passenger services to stay as KiwiRail cuts operations". Newshub. Retrieved 29 January 2022.
- ^ "The miracle of the boy who fell from the train. What really happened to Morgan Jones". Archived from the original on 24 July 2011. Abstract of an article in the New Zealand Listener 145 (2839) September 1994 pp 16–22, by Denis Welch
- ^ Jim Anderton (28 July 2003). "Safety improvements for Rail employees and travelling public in pipeline". New Zealand Progressive Party. Archived from the original on 16 August 2003.
- ^ Coastal Pacific Stations
Bibliography
- Churchman, Geoffrey B; Hurst, Tony (2001) [1990, 1991]. The Railways of New Zealand: A Journey through History (Second ed.). Transpress New Zealand. ISBN 0-908876-20-3.
External links
- Coastal Pacific
- Allen, Ian (16 August 2011). "Train service restart a bit Irish". The Marlborough Express. Blenheim: Fairfax New Zealand. Retrieved 17 August 2011.
- The West Australian: Open views for Pacific panorama – description by Stephen Scourfield of a trip on the Coastal Pacific